Annual Total Cost of Development Study
Awarded to Mitchell McDermott Construction Consultants
Department of Housing Local Government and Heritage(buyer)
- Published
- Published 27 February 2026
- Deadline
- Closed 2 April 2026
Tender documents
Skim pulls every file the buyer attaches to this process and extracts the requirements from it.
Documents as they publish
Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.
Overview
Contracting authority
Department of Housing Local Government and Heritage
Procuring entityWexford, Ireland
Authority website ↗
Find the key decision makers
The people who scope, score and sign this contract — names, roles and how to reach them.
What this covers
Annual Total Cost of Development Study
The Annual Total Development Cost Study for 2026 will build on the 2025 Insights into Total Development Costs Study, and will be similarly formatted to the 2024 and 2025 reports. The 2026 study will provide comprehensive analysis of the total cost of residential development across various locations in Ireland, updated with Q1 2026 construction costs. It will focus on five regional areas provisionally: Dublin, Cork, Limerick, Galway and the North West, and five typologies (See methodology) based on the Standardised Design Approaches study. The study will perform a comparative assessment using urban and regional costs across the five selected locations, highlighting differences in land prices, service infrastructure, and labour availability in the regions. These insights will offer a regional view on the factors influencing development costs. The study will further refine its cost analysis findings by modelling alternative scenarios for financing, land acquisition and development firm models. By providing annual updates and a clear regional perspective, the study will establish a benchmark for residential development costs in Ireland that can contribute to policy and industry practices toward more affordable delivery of housing. Further to this, a detailed analysis will be included of materials and finishes, which will evaluate their impact on construction costs, while considering quality and durability. This assessment will compare traditional construction methods with modern methods of construction to identify cost efficiencies and potential savings. Part of this study is the evaluation of Modern Methods of Construction (MMC). The study will carry out a comparison of the cost of construction for one typical house and one apartment building in one location. The comparison will use a typical category 1 panelised system and a selected category 2 volumetric system for each building. The study will also identify the cost reduction opportunities available with bathroom pods. Any other significant cost reduction from standardised components should also be identified. The study will consider costs in regards to four different methods of construction for one house typology. The methods of timber in construction, insulated concrete formwork, light gauge steel and standard concrete must be used in the types of buildings analysed. The report should outline the benefits of using MMC with a specific focus on improving efficiency and increasing scale in the construction of these types of buildings. This study will perform an Economies of Scale Analysis, whereby it will carry out a comparison of the cost of delivery for the 3 Bed Semi D and an apartment when delivered by a Public Limited Company (PLC), a medium size builder and a small builder for one location such as the Greater Dublin Area. As an additional feature, this study will incorporate opportunity costs by examining the economic value of alternative uses of land, capital, labour, and time, including the impacts of delayed delivery and underutilised capital over longer construction periods. This study will also allow for the analysis of opportunity costs associated with Modern Methods of Construction (MMC) by adding a value to the build time and the reduction of time in terms of savings; it will analyse the effect of this on the overall cost and efficiency of housing delivery.
€127,730Won by Mitchell McDermott Construction Consultants
Key details
- Country
- Ireland
- Status
- In delivery
- Category
- Services
- Estimated value
- €150,000
- Procedure
- Open
- Published
- 27 February 2026
- Deadline
- Closed
Award outcome
- Awarded value
- €127,730
- Award date
- 23 April 2026
- Contract period
- — → 19 December 2026
- Mitchell McDermott Construction Consultants
Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
29 April 2026
Contract Notice
27 February 2026
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
How to win this tender
Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.
See exactly how Skim’s agents do this →
Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.
Find tenders like this before your competitors do.
Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.