Roofing with Mechanical and Electrical Services upgrade works to existing North Building of Dundalk Institute of Technology
Awarded to McKeon Contech Ltd. t/a McKeon Group and Hereworks
Dundalk Institute of Technology_1155(buyer)
- Published
- Published 4 September 2026
Tender documents
Skim pulls every file the buyer attaches to this process and extracts the requirements from it.
Documents as they publish
Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.
Overview
Contracting authority
- Dundalk Institute of Technology_1155Procuring entity
52 awarded contracts
DUNDALK, Ireland
Authority website ↗
Find the key decision makers
The people who scope, score and sign this contract — names, roles and how to reach them.
What this covers
Roofing with Mechanical and Electrical Services upgrade works to existing North Building of Dundalk Institute of Technology
The existing roof covering membranes to the North Building are reaching the end of their economic life and require replacement. Some areas of the existing roof have insufficient thermal properties due to the absence of insulation and as part of the roofing upgrade works it is proposed to upgrade the thermal properties of the existing structure through the installation of an insulation layer below the new roofing membrane. In addition, the existing M and E Services infrastructure is in need of upgrading and bringing up to modern standards. The scope of works will also includes the installation of roof membrane/flashing to up-stands/parapets to the roof and refurbishment and replacement of existing rainwater goods as necessary. The removal of existing Asbestos containing materials as identified in Asbestos Survey Report including certified removal and disposal of identified materials or any other materials identified during course of works. The removal of both existing roof lights and removal of existing water tank rooms and the reinstatement of the roof structure and coverings to these areas and introduction of new AOV's above stair cores along with the replacement of a number of existing roof lights. Creation of new window opes in existing lecture rooms and provision of windows to same. Works to an existing Plant Room to accommodate larger water tank/ pumps including upgrade of existing structure and enclosure and the boilers in the existing boiler house are to be replaced along with the requirement to insulate the floor in plant area, also installation of new Air Source Heat Pump equipment to augment and replace existing boiler plant. Removal and disposal of obsolete plant along with removal and re installation of other plant and ducting to accommodate the roof works will be required and involve electrical works. M and E works required to all areas and to allow the removal of water tank enclosures including new water pipework distribution network in first floor ceiling void and associated builders works. Provision of a fall arrest system to the perimeter of roof The works will be undertaken in a single continuous phase which will commence in September 2023 and progress during educational activities of the 2023/2024 academic year albeit with restrictions regarding the level and extent of noisy working due to the potential impact on educational activities in the rooms/areas below. It is envisaged that a similar scheme of works may be undertaken to the adjacent South Building and the Contracting Authority reserves the right to extend the scope of this contract to encompass same should they wish to do so.
€3,553,458Won by McKeon Contech Ltd. t/a McKeon Group and Hereworks
Key details
- Country
- Ireland
- Status
- Awarded
- Category
- Works
- Estimated value
- €3,500,000
- Procedure
- Open
- Published
- 4 September 2026
Award outcome
- Awarded value
- €3,553,458
- Award date
- 23 May 2025
- Contract period
- — → 18 January 2026
- McKeon Contech Ltd. t/a McKeon Group and Hereworks
Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
4 September 2026
More from Dundalk Institute of Technology_1155
Other contracts from the same contracting authority. 52 awarded contracts on their hub.
Fire Safety Engineering and Disability Access Consultant
Awarded 7 September 2026
Project Supervisor Design Process Consultant Services
Awarded 7 September 2026
Roofing with Mechanical and Electrical Services upgrade works to existing North Building of Dundalk Institute of Technology
Awarded 3 September 2026
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
How to win this tender
Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.
See exactly how Skim’s agents do this →
Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.
Find tenders like this before your competitors do.
Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.