In deliveryIrelandServices€900,000Add to pipeline

Project Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for Infrastructure Delivery - Flood Mitigation Work at IDA Lands National Technology Park, Co. Limerick

Awarded to Fehily Timoney and Company_66616

IDA Ireland(buyer)

Published
Published 1 April 2025
Deadline
Closed 29 April 2025

Tender documents

Skim pulls every file the buyer attaches to this process and extracts the requirements from it.

Documents as they publish

Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.

View tender files

Overview

IDA Ireland awarded a contract to Fehily Timoney and Company for €535,580 to provide project management and integrated multi-disciplinary design team consultancy services for flood mitigation infrastructure at the National Technology Park in Co. Limerick. The scope includes designing and implementing a new flood defence system to protect against Shannon and Mulcair river flooding and surface water runoff, involving modifications to the existing berm, relocation of boundary fencing, and creation of a new stormwater drainage network with attenuation ponds. Services span planning permission, detailed design, works contractor procurement, construction oversight, and handover, with the team comprising project managers, engineers, quantity surveyors, environmental specialists, and other relevant advisors.

Contracting authority

Find the key decision makers

The people who scope, score and sign this contract — names, roles and how to reach them.

What this covers

  • Project Management (PM) Led Integrated Multi-Disciplinary Design Team Consultancy Services for Infrastructure Delivery - Flood Mitigation Work at IDA Lands National Technology Park, Co. Limerick

    IDA previously carried out a review of the options for flood alleviation at the National Technology Park NTP Limerick. The purpose of the review was to examine viable options to minimise the risk of ingress of flood waters to NTP from the Shannon and Mulcair and manage flood water arising from surface water run off within the park during river flood pluvial flooding. A new flood defence is necessary because the existing flood defence berm provides an insufficient level of protection and currently allows for water seepage beneath the berm through extensive granular soils. There is an existing boundary fence associated with a client’s facility to the east of the site And this fence will be relocated further to the south to facilitate the construction of the flood defence. Due to environmental constraints identified on the Mulkear River spawning lamprey it is proposed to remove existing stormwater outfalls from the site along the Mulkear River and create a new stormwater drainage network with attenuation ponds and treatment draining to the River Shannon through the existing outfall. The Project Management led Multi-Disciplinary Team should consist of suitably qualified and experienced resources including a Project Manager, Civil, Structural and Design Engineers, Quantity Surveyor, Employer’s Representative, PSDP, Assigned Certifier, Third Party co-ordinator, Ecologist and any relevant specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The scope of services for the Project Management Led Multi-Disciplinary Design Team will include if required completion of Stage 1 Planning Permission queries 2 Post Planning Submission and Detailed Design 3 Procurement and Assessment of Works Contractor 4 Construction and 5 Handover. A multi-disciplinary Technical Resource Resident Engineer will be required to be procured by the appointed Design Team and a separate appointment will be made for this.

    €535,580Won by Fehily Timoney and Company_66616

Key details

Country
Ireland
Status
In delivery
Category
Services
Estimated value
€900,000
Procedure
Open
Published
1 April 2025
Deadline
Closed
Classification (CPV)
Architectural, engineering and planning servicesCivil engineering consultancy servicesCivil engineering support servicesEngineering design services for the construction of civil engineering worksQuantity surveying services for civil engineering worksProject management consultancy services

Award outcome

Awarded value
€535,580
Award date
29 January 2026
Contract period
2 June 2025 → 1 June 2028
Winner
  • Fehily Timoney and Company_66616

Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    18 February 2026

  2. Contract Notice

    1 April 2025

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

How to win this tender

Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.

See exactly how Skim’s agents do this →

Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.

Find tenders like this before your competitors do.

Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.