Skip to content
SkimSkim home
Contract signedIrelandWorks€744,796Add to pipeline

9819 - Rock Cutting Stabilisation + Drainage Improvement Works CTB035D

Awarded to TRIUR Construction Limited

Iarnród Eireann-Irish Rail(buyer)

Published
Published 19 June 2026

Tender documents

Skim pulls every file the buyer attaches to this process and extracts the requirements from it.

Documents as they publish

Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.

View tender files

Overview

Iarnród Éireann awarded rock cutting stabilisation and drainage improvement works at trackside asset CTB035D to TRIUR Construction Limited on 18 June 2026. The scope includes removal of vegetation and loose rock, installation of rock anchors and fall drapery netting using rope access or MEWP methods, and installation of new trackside drainage to the Down Cess to manage water ingress.

Contracting authority

Find the key decision makers

The people who scope, score and sign this contract — names, roles and how to reach them.

What this covers

  • 9819 - Rock Cutting Stabilisation + Drainage Improvement Works CTB035D

    Iarnród Éireann (IÉ) require the services of an experienced civil engineering company to undertake the installation of rock fall netting to trackside rock cutting asset CTB035D, along with the installation of trackside drainage at this location. These works will include the removal of existing vegetation and loose rock prior to installation of rock anchors and new rock fall drapery. These works may require vegetation removal in the form of rope access methodology or from Mobile Elevated Working Platforms (MEWP’s), all staff to be suitably qualified to carry out all works activities. The worksite will also require the installation of new trackside drainage to the Down Cess to aid water ingress removal from the Rock Cutting CTB035D.

    €744,796Won by TRIUR Construction Limited

Key details

Country
Ireland
Status
Contract signed
Category
Works
Estimated value
€744,796
Procedure
Direct
Published
19 June 2026
Classification (CPV)
Works for complete or part construction and civil engineering workBuilding construction workConstruction work for industrial buildingsConstruction work for buildings relating to railway transportRailway station construction workEngineering works and construction worksConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkConstruction work for railways and cable transport systems+3 more

Award outcome

Award date
18 June 2026
Winner
  • TRIUR Construction Limited

Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    19 June 2026

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

How to win this tender

Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.

See exactly how Skim’s agents do this →

Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.

Find tenders like this before your competitors do.

Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.

TRIUR Construction Limited won 9819 - Rock Cutting Stabilisation + Drainage Improvement Works CTB035D