Skip to content
AwardedIRLServicesFramework agreement€300,000

Contract for Project Management Led Integrated Multidisciplinary Design Team Consultancy Services for a feasibility Study for the drainage Development of the IDA Landbank Cork

Published
Published 30 March 2026
Deadline
Closed 17 May 2024

Overview

The current Industrial Development Agency (IDA) land holding in Ringaskiddy, Co. Cork comprises c.164ha divided across multiple sites with the greater part of the lands located to the south of the proposed motorway route reservation. In addition, several assets in the area are in IDA ownership including the foul and surface water network which serves both the existing developments and the undeveloped land holdings. IDA Ireland wishes to appoint a consulting engineer to prepare an engineering led feasibility study re the future development of the IDA Landbank at Barnaheley/ Raheens East / Loughbeg, Co. Cork. The successful tenderer will carry out a capacity review of the existing surface and foul water network(s)/ pumping stations in the study area, the production of a hydraulic model for the Ringaskiddy Local Catchment and a suite of recommendations for the upgrade works were necessary to facilitate further development of the land bank (s). The review also must ensure that the inclusion of the storm and foul water pumping station must form part of the proposed upgrade(s) to the existing IDA Drainage Water Networks. The review must also include for the procurement and management for requisite range and scale of on site investigation contracts including but not limited to. Ground Penetrating Radar Survey, CCTV Survey, Flow Monitoring, Topographical Survey. In addition the review must consider the option appraisal for the attainment of a new Foreshore Licence by IDA Ireland and allow for consultation with Maritime Area Regulatory Authority, ultimately providing programmatic, financial and sustainability modelling for the optimised solution. The Feasibility Stage will be broken into five workstreams as follows Workstream 1. Collation of data Workstream 2. Surveys, modelling output Workstream 3. Design Review, Capacity Assessment and Options Report. Workstream 4. Design verification, targeted surveys and provision of full-time resident engineer. Workstream 5. Recommendation report and scope of service requirements for next phase. The successful firm will ensure provision of the required services and appoint all the appropriate consultants under their control as required. Note all appointments will be made under the Government “Standard Conditions of Engagement for Consultancy Services (Technical)” will be employed. Tenderers can find the full suite of requirements in the tender documents, all responses must be submitted in a zip file format.

Key details

Country
IRL
Status
Awarded
Category
Services
Estimated value
€300,000
Procedure
Open
Contract type
Framework agreement
SME suitable
Yes
Published
30 March 2026
Deadline
Closed
Classification (CPV)
Architectural, engineering and planning servicesCivil engineering consultancy servicesCivil engineering support servicesStructural engineering consultancy servicesEngineering design services for the construction of civil engineering worksQuantity surveying services for civil engineering worksMechanical and electrical engineering servicesArchaeological services+2 more

Award outcome

Awarded value
€297,570
Award date
23 September 2025
Contract period
— → 13 September 2027
Winner
  • RPS Group Limited_27161

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    30 March 2026

  2. Contract Notice

    22 April 2024

  3. Contract Notice

    5 April 2024

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Contract for Project Management Led Integrated Multidisciplinary Design Team Consultancy Services for a feasibility Study for the drainage Development of the IDA Landbank Cork — won by RPS Group Limited_27161 — Skim