FCC/117/25.F Multi-Party Framework Agreement for the Provision of Engineering Consultancy Services for Bridge Rehabilitation, Assessments, and Inspections (2025–2029) – Fingal County Council
Awarded to Clandillon Civil Consulting
Fingal County Council_371(buyer)
- Published
- Published 10 July 2025
- Deadline
- Closed 19 August 2025
Tender documents
Skim pulls every file the buyer attaches to this process and extracts the requirements from it.
Documents as they publish
Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.
Overview
Contracting authority
- Fingal County Council_371Procuring entity
9 awarded contracts
Dublin, Ireland
IE-NATIONAL: 9509807N
Authority website ↗
Find the key decision makers
The people who scope, score and sign this contract — names, roles and how to reach them.
What this covers
FCC/117/25.F Multi-Party Framework Agreement for the Provision of Engineering Consultancy Services for Bridge Rehabilitation, Assessments, and Inspections (2025–2029) – Fingal County Council
Fingal County Council (FCC) seeks to establish a multi-party framework for engineering consultancy services for bridge rehabilitation, including project design, contract documentation, administration, supervision, assessments, and inspections of non-national road structures (road bridges, retaining walls, footbridges, culverts, etc.). Scope of Services: • Bridge Assessments: Bridge Inventory Surveys (BIS), Maintenance Inspections (MI), Engineering Inspections (EI), and Principal Inspections in accordance with BAMS and TII guidelines. • Rehabilitation Works: Detailed repair design for damaged structures, including strengthening, widening, concrete repairs, protective coatings, and parapet replacements. Prepare cost estimates of the works requried. • Emergency Repairs: Attend damaged bridge sites within 24 hours, conduct inspections, and prepare technical reports, structural analysis, and bills of quantities. • Surveys and Reports: Procure topographical and GPR surveys, AA and EIAR screening reports, bat/bird surveys and ecological surveys, hydrological reports; preparation of draft and final Principal Inspection reports with Executive Summaries. • Data Management: Upload inspection results and data to MapRoad and BAMS systems; prepare executive summaries with bridge prioritization. • Project Delivery: Full ownership from preliminary design through to construction monitoring, snagging, and handover (Stages 1–5). • Liaison: Coordinate with internal FCC departments, OPW, Inland Fisheries, NPWS, and other statutory bodies. • Health and Safety: Fulfil Designer and PSDP duties under Construction Regulations 2013. • Documentation: Submit reports, drawings, and other documentation in complete approved PDF format; take and distribute detailed meeting minutes. • Project Management: Appoint a dedicated Team Leader; manage staff changes with FCC approval; provide fully resourced project programmes within 7 days of appointment. • Quality Assurance: Include for technical advice, modern technologies, liaison with third parties, and adherence to evolving Health and Safety protocols in tendered rates. A detailed specification will be provided as stage 2 of the process
€2,000,000Won by Clandillon Civil Consulting
Key details
- Country
- Ireland
- Status
- Contract signed
- Category
- Services
- Estimated value
- €2,000,000
- Procedure
- Selective
- Contract type
- Framework agreement
- Published
- 10 July 2025
- Deadline
- Closed
Award outcome
- Award date
- 20 July 2026
- Clandillon Civil Consulting
Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
13 October 2026
Contract Notice
22 July 2025
Contract Notice
10 July 2025
More from Fingal County Council_371
Other contracts from the same contracting authority. 9 awarded contracts on their hub.
FCC/176/25F Single Supplier Framework for the Provision of Services for Planting and Maintenance of Council-Owned Summer/Winter Floral Display Baskets/Planters for various locations for Fingal Co Co
Won by Redlough Landscapes
Awarded 24 April 2026
FCC/120/19 Multiparty framework for Architect led Integrated Conservation Design Team Services with initial projects
Won by Blackwood Associates
Awarded 20 April 2026
FCC/084/25 Establish a Single Party Framework for Multi-disciplinary Consultancy Services for the River Liffey Fish Barrier Mitigation project for three Dublin Local Authorities with initial contract
Won by MKO - McCarthy Keville O'Sullivan Ltd
Awarded 26 November 2025
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
How to win this tender
Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.
See exactly how Skim’s agents do this →
Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.
Find tenders like this before your competitors do.
Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.