Skip to content
AwardedIRLWorks

Aghafad Pedestrian and Cycle Scheme

Published
Published 29 January 2026
Deadline
Closed 21 July 2025

Overview

Provision of shared walking and cycle facility from the industrial unit at Aghafad, Longford Town, to link with existing service road along the eastern boundary of the Back Stage theatre and Longford Slashers GAA and thus provide a connection onto the Royal canal Greenway. Ancillary works include the provision of a new water main, drainage, public lighting, accommodation works etc. The scheme will consist of: - Three metre wide, shared pathway, commencing to the immediate east of the existing Longford Slashers GAA entrance and proceeding approximately 400m south west along the L1127 to the Aghafad existing factory entrances, with uncontrolled crossing where required. - Shared pathway to separately advance, approximately 290 metres north along the eastern boundary of Longford Slashers GAA with Prospect Wood, to include the partial redesignation of the existing service road for pedestrian / cyclist provision. - Raised pedestrian / cyclist crossing at the main Slashers GAA entrance, and separate raised pathway crossing to align with the reassignment of existing parking spaces for the purposes of pedestrian / cyclist connectivity to the front entrance door of Slashers GAA / Backstage Theatre. - Accommodation works to include boundary and entrance treatment to main entrance and that of the upper Slasher GAA / Backstage Theatre / Gaelscoil Longfoirt carpark, relocation / redesign of existing public lighting poles, signage, drainage, etc. - Provision of new water main to replace section of existing asbestos water main.

Key details

Country
IRL
Status
Awarded
Category
Works
Procedure
Open
Published
29 January 2026
Questions by
16 July 2025
Deadline
Closed
Classification (CPV)
Works for complete or part construction and civil engineering workConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkGeneral construction work for pipelinesStorm-water piping construction workWorks related to water-distribution pipelinesConstruction work for highways, roadsFootpath construction workCycle path construction work

Award outcome

Awarded value
€446,125
Award date
29 January 2026

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    29 January 2026

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Aghafad Pedestrian and Cycle Scheme — Skim