Skip to content
AwardedIRLWorks

Tipperary County Council - Clonmel Town Flood Wall Joint Seal Replacement

Published
Published 5 September 2025
Deadline
Closed 27 June 2025

Overview

Tipperary County Council - Clonmel Town Flood Wall Joint Seal Replacement River Suir (Clonmel) Drainage Scheme - Flood Wall Joint Seal Replacement. In order to address long-term issues of flooding in Clonmel, the Office of Public Works (OPW) commissioned a study of the catchment area and to develop sustainable options to address flood risk in the town and the surrounding areas. The overall flood defence scheme comprised of: ● 3.8 km of flood walls ● 3.5 km of embankments ● 850 m of demountable defences ● 5.9km of storm water sewers ● 12 pumping stations ● 2 fish passes ● the replacement of three bridges ● strengthening / widening of a further two Bridges. Work on the scheme was completed in 2013. As part of the construction of new flood walls and the modification of existing quay walls, joints were constructed utilising a two-part immersible biodegradation resistant/UV resistant polysulphide sealant on both sides of the wall. There are visible signs of these seals reaching the end of their operational life where the sealant has shown signs of shrinkage and de-bonded from the concrete. The scope of this contract includes the replacement of the joint sealant at all joints located along the New and Old Quay flood walls.

Key details

Country
IRL
Status
Awarded
Category
Works
Procedure
Open
Published
5 September 2025
Questions by
9 June 2025
Deadline
Closed
Classification (CPV)
Flood-control valvesStructures of bridgesFloodgatesUrban development construction workConstruction work for swimming poolConstruction work for buildings relating to water transportConstruction work for bridges and tunnels, shafts and subwaysConstruction work for bridges+28 more

Award outcome

Awarded value
€168,490
Award date
5 September 2025

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    5 September 2025

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Tipperary County Council - Clonmel Town Flood Wall Joint Seal Replacement — Skim