AwardedIRLWorks€120,000

County Kerry Structure Repair Contract 1, 2025

Published
Published 20 August 2025
Deadline
Closed 2 April 2025

Overview

Mangerton Bridge The Works shall consist of the scope of works shown on the drawings and specifications including: • Site set-up and Traffic management; • Site clearance and security; • Removal of vegetation on approach walls, deck, and parapets; • Removal of all grout begs and loose masonry stones and replacement with stonework; • Demolition of destabilised section of abutment with temporary works in place; • Reconstruction of a section of abutment; • Cleaning and repointing of all masonry joints that show degradation using a suitable lime-based mortar; • Cleaning and repointing of downstream wing wall; • Repair of damaged parapet to match existing; • Removal of soft verges and replacement with concrete rubbing strips; • Act as PSCS for the construction works. Glanlea Bridge The Works shall consist of the scope of works shown on the drawings and specifications including: • Site set-up and Traffic management; • Site clearance and security; • Removal of vegetation on approach walls, deck, and parapets; • Demolition and disposal of existing parapets; • Construction of a new reinforced concrete deck, this deck must be COMPLETED within 3 day road closure to allow for Milk Collection. • Resurfacing of the new deck; • Construction of new parapets; • Demolition of the overhanging concrete lined riverbed; • Installation of rock armour/ riprap lining on riverbed; • Minor scour repairs to the piers and abutments; • Installation of rock armour backed in lean mix concrete to the embankment; • Act as PSCS for the construction works. Craughdarrig Bridge The Works shall consist of the scope of works shown on the drawings and specifications including: • Site set-up and Traffic management; • Site clearance and security; • Removal of vegetation on approach walls, deck, and parapets; • Excavation and removal of existing clappers and replacement with cast in-situ concrete slab; • Resurfacing of the new deck; • Repair and replacement of missing stonework on abutments; • Construction of 1m high stone masonry parapets; • Construction of riverbed lining using rock matching existing; • Removal of soft verges and replacement with concrete rubbing strips; • Act as PSCS for the construction works.

Key details

Country
IRL
Status
Awarded
Category
Works
Estimated value
€120,000
Procedure
Open
Published
20 August 2025
Questions by
26 March 2025
Deadline
Closed
Classification (CPV)
Structures of bridgesConstruction work for bridges and tunnels, shafts and subwaysConstruction work for bridgesBridge construction workRoad bridge construction workBridge renewal construction work

Award outcome

Awarded value
€249,291
Award date
20 August 2025

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    20 August 2025

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: County Kerry Structure Repair Contract 1, 2025 — Skim