Skip to content
AwardedIRL€50,000

Cuan na Loinge Road Coastal Flooding Mitigation Project iaw TII PMG-02041 Phases 2, 3, 4

Published
Published 8 July 2025
Deadline
Closed 20 September 2024

Overview

A significant length (approximately 200m) of this local tertiary road (L-52214), it’s junctions with two side roads and a house entrance in Cuan na Loinge, Ceantar na nOileán in the Conamara South Engineering area is inundated with seawater at very high tides and storm surge events on an ever-increasing basis. This results in the road being impassable for hours at a time. Up to 17 residences are affected by this. The OPW have a report dated from 2005 indicating this location as a problem area, with coastal flooding described then as occurring twice a year. The objective of this project is to raise the level of the road so that inundation events and inundation periods are significantly reduced, even for Highest Astronomical Tides (when storm surge and high tides coincide), but that the current road width, tidal patterns, and flows are not significantly altered. The final design must be sympathetic to the area, it’s heritage and its vistas. One of the main constraints on this project is its sensitive location from an environmental point of view. It is located in/along the Kilkieran Bay and Island SAC (Sitecode 002111).

Key details

Country
IRL
Status
Awarded
Estimated value
€50,000
Procedure
Open
Published
8 July 2025
Questions by
13 September 2024
Deadline
Closed
Classification (CPV)
Civil engineering consultancy servicesHighways engineering servicesEnvironmental engineering consultancy servicesEnvironmental impact assessment for constructionEnvironmental Impact Assessment (EIA) services for constructionConstruction consultancy services

Award outcome

Awarded value
€87,458
Award date
8 July 2025

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    8 July 2025

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Cuan na Loinge Road Coastal Flooding Mitigation Project iaw TII PMG-02041 Phases 2, 3, 4 — Skim