Skip to content
SkimSkim home

Public sector tenders

Open for bidsUnited KingdomServicesFramework agreement£8,805,241Add to pipeline

Framework Agreement for the Provision of Facilities Management Repair and Maintenance Services

North East Lincolnshire Borough Council(buyer)

Published
Published 20 May 2026
Deadline
Deadline: 11 January 2027 (60 days left)

Tender documents

Skim pulls every file the buyer attaches to this process and extracts the requirements from it.

Documents as they publish

Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.

View tender files

Overview

North East Lincolnshire Borough Council is seeking to establish a four-year framework agreement for facilities management repair and maintenance services across council-owned and leased assets. The scope covers corporate, commercial, industrial, education, leisure, and residential properties, divided into lots for asbestos services, electrical works, general building and flooring, joinery and carpentry, and mechanical maintenance. The contract has an estimated total value of £8,805,241, with tenders due by 11 January 2027.

Contracting authority

Find the key decision makers

The people who scope, score and sign this contract — names, roles and how to reach them.

Lots (11)

  • Asbestos Surveying and Analytical Works

    Suppliers shall be able to carry out various works with asbestos containing materials including: Sampling, Air Monitoring, Management Surveys, Reinspection Surveys, Refurbishment Surveys, Demolition Surveys

    £257,600
  • Asbestos Emergency Reactive Work

    Suppliers shall be able to carry out various works with asbestos containing materials including: Emergency Removals Emergency Sampling Emergency Analytical

    £82,800
  • Asbestos Removal Work

    Suppliers shall be able to carry out various works with asbestos containing materials including: Licenced Removal Non-Licenced Removal Notifiable Non-Licenced Removal Fly Tip Removal

    £1,196,000
  • Laboratory Services

    Suppliers shall be able to carry out various works with asbestos containing materials including: Sampling Analysis

    £55,200
  • Electrical Reactive and Planned Works

    Reactive and Planned works across the Authority's property portfolio in relation to all types of electrical works. As a minimum, the Supplier shall be capable of delivering the following if required by the Authority: Installation of new mains wiring including lighting and small power, including following mains upgrades and meter changes. Emergency Call Outs (24/7/365) to power outages and electrical issues. Lighting design and upgrades. Fault finding and emergency repairs. Making safe of electrical issues e.g. following vandalism at void sites, following flood damage. Emergency Lighting failures. Minor Works Electrical Installations including replacement of faulty sockets, switches, accessories, replacement of failed consumer units / distribution boards. Repair of door entry and intercom systems. Repairs to CCTV power supplies and associated electrical infrastructure. Earthing and bonding repairs. Planed replacement of electrical installations and equipment Supply and installation of sub-meters

    £3,325,085
  • Electrical Statutory Planned Preventative Maintenance (PPM)

    Portable Appliance Testing (PAT) - The Provision and Use of Work Equipment Regulations 1998 & ISBN 978-0-86341-833-4 Electrical - Fixed Electrical Installations - Electricity at Work Regulations 1989 and BS7671 18th Edition (BS7671:2018+A3:2024) including all amendments. Fan Convectors - installed to Approved Document F and Approved Document P of the Building Regulations Lighting Conductors - Completed by a competent person to BS 7430:2011 + A1:2015 in line with BS EN62305 Interceptor Alarm - British & European Standard BS EN 858-1, PPG3 & ISO 14001 Emergency Lighting - Electricity at Work Regulation 1989, Building Regulations Approved Documents, BS 5266-1:2025), BS EN 50172:2024, I.C.E.L 1008 and Regulatory Reform (Fire Safety Order 2005) Disabled Toilet Alarm - The Building Regulations to Approved Document M Part 12015 edition incorporating 2016 amendments and Approved Document M Part 2 2015 edition incorporating 2020 and 2024 amendments, BS 8300-2:2018 Design of Buildings Part 2 Ducting - Fire, Smoke & Volume Control Dampers - BS EN 12101-8 & BS 9999

    £151,028
  • General Building Works

    The scope of the services required to be delivered by the Supplier under this lot are detailed below: Concreting Plastering Rendering Brick work repairs

    £630,134
  • General Building Work - Flooring

    Supply, installation and removal of flooring.

    £445,940
  • Joinery and Carpentry

    General carpentry and joinery including but not limited to the supply, installation, repair, removal and disposal of the following: - installing cabinetry - doors - gates - fencing - banisters

    £339,303
  • Mechanical Reactive and Planned Works

    Reactive and Planned works across the Authority's property portfolio in relation to all types of Mechanical works. As a minimum, the Supplier shall be capable of delivering the following works under this Framework: Boiler breakdown repairs Heating system fault finding Pump repairs and replacement Radiator leaks and repairs Valve and actuator replacement Heating control system repairs Burst pipe repairs Water leaks and emergency isolation Blocked and damaged pipework Sanitaryware repairs and replacement Tap and shower repairs Hot water cylinder repairs Water heater repairs Drainage and waste pipe repairs Emergency gas leak investigations Gas pipework repairs Commercial and domestic boiler repairs Emergency isolation of gas supplies Ventilation plant breakdowns Extract fan replacement Air handling unit (AHU) repairs Controls and BMS-related repairs Kitchen extract system repairs Asset replacement programmes Plumbing Upgrades

    £2,237,066
  • Mechanical Statutory Planned Preventative Maintenance (PPM)

    Planned Preventative Maintenance (PPM) shall be delivered in accordance with this Specification. Reactive works are limited to fault rectification arising from unplanned failures and shall only be within scope where expressly instructed by the Authority. Improvements, lifecycle replacement, major renewals, project works and variations are excluded from scope unless separately instructed. Oil Boiler Servicing - OFTEC The Control of Pollution (Oil Storage) (England) Regulation 2001 Gas Boiler Servicing - Gas Safety (Installation and Use) Regulation 1998 including Gas Tightness Test- Gas Safety (Installation and Use) Regulation 1998 Gas Safety (Installation and Use) Regulation 1998 Catering Equipment - The Health and Safety at Work Act 1974, Provision and Use of Work Equipment Regulations 1998. Pressure Systems Safety Regulations 2000, Control of Substances Hazardous to Health Regulations 2002 and Electricity at Work Regulation 1989 Unvented Water Heaters Vented Hot Water Boilers Sump Pump - Building Regulations Approved Documents. Mechanical Ventilation Cold Water Storage

    £85,084

Key details

Country
United Kingdom
Status
Open for bids
Category
Services
Estimated value
£8,805,241
Procedure
Open procedure
Rules
Procurement Act 2023
Contract type
Framework agreement
SME suitable
Yes
Published
20 May 2026
Questions by
21 December 2026
Deadline
11 January 2027
Classification (CPV)
Pedestrian ways construction workRepair and maintenance of plantConcrete workBricklaying workAsbestos-removal workElectrical installation workPlumbing and sanitary worksMechanical installations+19 more

Competition and scoring criteria

Expected competition

5

Median bids on comparable tenders

Open and restricted tenders in Construction work drew a median of 5 bids over the last 24 months; 13% received only one.

How bids will be scored

Price 70% · Quality 30%

  • Planning and Delivery5%
  • Quality Assurance5%
  • Health and Safety5%
  • Laboratory Works5%
  • Social Value10%
  • Cost70%

Price and cost criteria in black, quality in blue.

Market context

Typical award in Construction work

£160,228

Median of 19,437 awards in the last 24 months

North East Lincolnshire Borough Council in the last 12 months

42

contracts awarded, worth £436,254,660 in total

See their procurement profile →

Recent awards in Construction work

The latest contracts other buyers awarded under the same classification.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Notice

    11 November 2026

  2. Prior Information Notice

    20 May 2026

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

How to win this tender

Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.

See exactly how Skim’s agents do this →

Comparing platforms? Skim is set against the alternatives for tender alert services, bid management software and tender management software.

Find tenders like this before your competitors do.

Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.