Contract signedUnited Kingdom
Provision of Interim Enterprise Server Infrastructure (1-3 Year Horizon)
- Published
- Published 2 April 2026
Overview
Objectives
• Ensure short- to medium-term continuity of business-critical applications (e.g., QL housing management, SQL databases, Active Directory, File Server, and local backup services).
• Provide a secure and resilient on-premises server environment that supports premises-managed software such as QL, while complementing St Basil's longer-term hybrid/cloud strategy.
• Avoid unnecessary over-investment in hardware that may be redundant once certain systems move fully to the cloud.
• Reduce the risk of service disruption.
• Ensure compliance with UK data protection, cyber security, and social housing regulatory requirements.
Scope of Supply
The supplier will be expected to:
• Propose the most appropriate interim server solution (hardware, configuration, and licensing) that meets St Basils' 1-3 year needs.
• Balance resilience and performance with cost-effectiveness, recognising this is not a permanent, large-scale data centre investment.
• Ensure the solution can reliably host premises-managed applications such as QL housing management and other dependent SQL-based systems.
• Include options for limited resilience (e.g., RAID storage, dual power, or simplified HA if cost-effective).
• Provide all required operating system and database licences.
• Deliver, install, and configure to industry best practice (performance, resilience, and security).
• Provide knowledge transfer and documentation to the St Basils ICT team.
• Offer 3- to 5-year support and maintenance, recognising hardware may be retired earlier.
Reference Systems
The interim server must support and/or integrate with St Basils current applications and core systems.
Key Requirements
Suppliers should explain how their solution will:
• Performance: Run current workloads reliably for 1-3 years.
• Resilience: Provide core redundancy (power, RAID storage) but without over-investment in complex clustering.
• Security: Include TPM 2.0, encryption, secure boot, and baseline hardening (Desirable).
• Networking: Work with current infrastructure (1/10 Gb copper switching).
• Backup/DR: Integrate with Datto/Veeam, support immutable offsite copies (cloud or equivalent).
• Compliance: Support GDPR, Cyber Essentials Plus, and ISO27001/27002 alignment.
• Support: Provide warranty/support cover even if hardware is retired early.
• Sustainability: Be energy efficient and align with St Basil's' Net Zero and sustainability strategy.
Deliverables
• Fully commissioned and documented interim server solution.
• Licensing, warranty, and support agreements.
• Handover to ICT staff with training/knowledge transfer.
• Backup/restore test to evidence capability.
Supplier Response
Suppliers should include:
• Proposed interim solution and rationale (with options, if available).
• How the design balances performance, resilience, and cost for a 1-3 year horizon.
• Implementation plan and timescales.
• Total cost of ownership (hardware, software, licensing, support).
• Warranty/support proposals that allow early retirement.
• Evidence of similar work with housing associations/charities.
• Social value commitments
Implementation & Costing Requirements
The supplier must ensure that their tendered price is fully inclusive of all costs required to deliver a fully operational server environment. This includes, but is not limited to:
• Supply, delivery, and installation of all hardware and components.
• Installation and configuration of all required software, licences, and security features.
• Loading of existing backups/data into the new environment.
• Testing to confirm full restoration of services, including user acceptance testing (UAT) with St Basils ICT team.
• Verification that all core applications and integrations (see Section 4) are operating correctly.
• Provision and configuration of any required network cabling, racks, rails, or accessories.
• All engineer and professional services costs (installation, testing, documentation, knowledge transfer).
• All travel, subsistence, and associated expenses.
No additional or hidden costs will be accepted. The final tendered price must cover a turnkey delivery resulting in a live, resilient, and fully operational environment.
Key details
- Country
- United Kingdom
- Status
- Contract signed
- Procedure
- Limited
- Published
- 2 April 2026
Award outcome
- Awarded value
- £77,224
- Award date
- 1 December 2025
- INTERCITY TECHNOLOGY LIMITED
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
2 April 2026
View notice ↗
Contracting authority
ST BASILS
BuyerBirmingham, United Kingdom
GB-COH: 03964376
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.