Skip to content
Contract signedUnited Kingdom

Electrical Infrastructure Upgrade to Support SALIX Works

Published
Published 19 March 2026

Overview

The SALIX 3C works involve the removal of the existing gas boilers within the boiler house and the supply, installation, and commissioning of two new electric boilers, each rated at 252kW. The site's existing electrical capacity is insufficient to support these works. An upgrade to the electrical infrastructure is therefore required to meet the additional demand and maintain headroom. The electrical upgrade includes the following: The current on-site transformer is rated at 0.8MVA. It is proposed that this be replaced with a new 1.5MVA transformer to support the increased demand. Transformer to include a feeder pillar for distribution of new LV supplies and to meet DNO requirements. This upgrade will maintain the existing headroom to contribute towards future EV charging (requirements not known at this time). Works are to include for the excavation, laying of ducts, cables, backfilling, and reinstatement of the cable route between the transformer and the plant room. New cable containment will be required at both ends of the proposed duct route. All works are to be completed in accordance with relevant standards, regulations, and site. Requirements, including Testing of the HV and LV electrical installation and co-ordination of works with Humberside Police Joint Estate Service Engineers and the DNO.

Key details

Country
United Kingdom
Status
Contract signed
Procedure
Direct
Published
19 March 2026

Award outcome

Awarded value
£228,869
Award date
17 March 2026
Winner
  • FAIRBURNS GROUP LIMITED

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    19 March 2026

    View notice ↗

Contracting authority

  • The Police and Crime Commissioner for Humberside

    Buyer

    Cottingham, United Kingdom

    GB-PPON: PWLD-8931-TXBR

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Electrical Infrastructure Upgrade to Support SALIX Works — won by FAIRBURNS GROUP LIMITED — Skim