Contract signedUnited Kingdom

Eagle Kitchen Block Refurbishment

Published
Published 6 March 2026

Overview

Scope of works - Demolition- • Strip out all windows and doors. • Remove existing fascia, guttering and downpipes • Remove existing roof covering • Fully strip out all internal fittings, ceilings and floor coverings • Strip out and isolate plumbing and electrical works. • Demolish internal wall • Form new door to Accessible WC DPC- • Inject all existing walls with new DPC injection Steel work- • Install new veranda steel framework. Foundations- • Excavate & concrete 4 x pad foundations as engineers' details • Excavate & concrete strip foundation for dwarf wall Brickwork- • Build new dwarf wall in engineering red bricks with brick on edge detail to the top of the wall. • We have allowed for 1 bricklayer plus materials for general brick work repairs to the existing building. Foul and rainwater underground drainage- • We have allowed to install new under ground drains and manholes as shown on the architect's drawings with a connection on to the existing run. Back fill and make good. Roof timbers- • We have allowed for all new roof timbers to the veranda only with Stirling board over the top and 9mmm ply to the underside as the engineer's detail. • We have allowed for new white UPVC fascia and guttering to the veranda and existing building. Insulation- • All roof; walls and acoustic insulation is included as per the architects' drawings. • With the associated vapour barriers as specified Internal walling- • All perimeter treated timber studwork as shown • All internal standard studs as shown • All metal stud walls with 18mm sheathing ply to both sides as shown. Joinery- • MDF window boards to all windows • 3 x vertical pipe boxings • 1 new internal door set • Architraves to 1 internal door • Supply and fit new kitchen from Howdens • Supply and fit internal dividing panels to the women's and man's WC • Supply and fit fire blanket, extinguisher and signage Plastering- • Plasterboard and skim ceilings • Plasterboard only the walls Electrical works- • All electrical items as specified • Supply and fit Solar panels (PV) • All extractor fans x4 • Panel heaters x4 • Smoke alarms Plumbing- • Remove and dispose of redundant services • Supply and fit 3no close coupled WC pans, cisterns and seats • Supply and fit 3no wall hung WHB's complete with TMV's and mixer taps • Supply and fit 1no urinal with exposed cistern and flush pipe • Supply and fit 1no Doc M pack with contrasting grab rails • Supply and fit 2no water heaters • Fit kitchen sink with allowance for 1no appliance Wall finishes- • Supply and fit white rock to all walls. Decorations- • Paint ceilings white • Paint internal exposed woodwork Floor coverings- • Supply and fit floor coverings as specified with coved upstand External paving- • Begin to excavate the existing concrete slab and dispose of from site. • Supply and install 150mm of type 1 sub-base material to the entire area and compact in layers using heavy plant. • Supply and install necessary formwork. • Break points and levels to be agreed on site. • Supply and install corduroy hazard warning tactiles • Supply and install C30/35 ready-mix concrete to achieve approx. 100mm thickness. • Level, tamp and apply brushed finish • Spread topsoil and seed to make good, disturbed areas • Install 4 x kee klamp barriers near doors/windows Quotation. Cost of works £117'181.54+VAT

Key details

Country
United Kingdom
Status
Contract signed
Published
6 March 2026

Award outcome

Awarded value
£120,000
Award date
1 November 2025
Winner
  • Belton Construction

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    6 March 2026

    View notice ↗

Contracting authority

  • Eagle & Swinethorpe Parish Council

    Buyer

    Lincoln, United Kingdom

    GB-PPON: PPTN-4921-JHGH

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Eagle Kitchen Block Refurbishment — won by Belton Construction — Skim