Skip to content
In deliveryUnited KingdomServices£65,000

ISO 11 - Fumigation Lobby Replacement Project Manager

Published
Published 3 February 2026
Deadline
Closed 11 March 2026

Overview

The contract is for a single supplier to provide Project Management in relation to ISO 11 Fumigation Lobby replacement project at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF. Existing Arrangements The ISO 11’s fumigation lobby was installed pre-2007 and is now unserviceable as the manufacturer is no longer able to provide support due to obsolescence and inherent building design & operability shortcomings, including its capacity and physical orientation. It was decommissioned in 2017. Technical and operational issues within the ISO11 fumigation lobby are summarised below. Technical issues: • No temperature control which compromised the efficacy and limited the operation of the lobby. • Unserviceable HMI panel and obsolete software and controls lacking any Original Equipment Manufacturer (OEM) support. Operational issues: • Unsuitable for removal of large items such as animal gating (3.0m length x 1.5m height) • Ergonomic issues including the loading area to corridor angled at 90 degrees requiring a tight manoeuvre in loading the lobby. As no fumigation lobby is available in ISO11, items are currently removed from the containment area of the building and taken to Plowright for fumigation following a temporary process which has associated biosafety and H&S issues and risks. This temporary process can only be implemented during the facility planned shut-down periods resulting in items accumulating in ISO11 which has impacted ISO 11 operational space. This situation is unacceptable in the long-term as highlighted by the HSE inspection conducted in March 2022. Preferred Future Position: The preferred future position is to have a fully functional formaldehyde lobby, accessible from within ISO11, capable of accommodating large items and equipment. This lobby should have a minimum lifespan of 15 years with fully automated controls and appropriate monitoring systems/alarms. The space must be reconfigured by redefining the containment boundary and install a new fumigation lobby with enhanced monitoring and safety features. There are a total of 9 (nine) Work packages, not including Project Management within the overall project. These will require procurement and delivery under the scope of Project Management: - WP1: Civils and builders works package, including waste disposal - WP2: CDM, site management and welfare facilities - WP3: Modifications to vacuum drainage system - WP4: New fumigation lobby - WP5: Ventilation pressure controls - WP6: Fumigation lobby ductwork, reheat battery, pipework & controls - WP7: Local UPS supply re-feeding - WP8: HIRA studies - WP9: Access control system modifications

Key details

Country
United Kingdom
Status
In delivery
Category
Services
Estimated value
£65,000
Procedure
Open
Published
3 February 2026
Deadline
Closed
Classification (CPV)
Project management consultancy servicesFumigation services

Award outcome

Award date
1 April 2026
Contract period
5 April 2026 → 31 March 2028
Winner
  • Grationeer Ltd

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    12 May 2026

    View notice ↗
  2. Contract Notice

    3 February 2026

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: ISO 11 - Fumigation Lobby Replacement Project Manager — won by Grationeer Ltd — Skim