Skip to content
Contract signedUnited KingdomServices

Essella Road Footbridge

Published
Published 29 January 2026

Overview

Essella Road Footbridge, Ashford, Kent, carries a public footpath over a Network Rail (NR) operational railway, it links a large secondary school with residential catchment area the other side of the railway and is very well used. The responsibility for the maintenance of the footbridge sits with KCC, following an agreement made in 1936 between Southern Railway Company and The Urban District Council of Ashford in County of Kent. The responsibility then transferred over to KCC in 1953, after taking over the role of Highway Authority, at that time. Due to the deterioration of structure, it is KCCs duty to ensure sufficient design and works are carried out to improve the current state and ensure that the footbridge is fit for continued public use. The structure crosses 2 no. tracks on the Ashford to Ramsgate (via Canterbury) line between Ashford and Wye stations. The structure also crosses an additional 4 no. tracks and infrastructure forming part of a rail maintenance depot operated by Hitachi. The bridge deck is a 37.5 m single span steel through truss on masonry abutments. Each abutment comprises two voided sections forming a tower beneath the landing at the deck ends, and the approach stairs used to access the structure.

Key details

Country
United Kingdom
Status
Contract signed
Category
Services
Procedure
Limited
Published
29 January 2026
Classification (CPV)
Architectural, construction, engineering and inspection services

Award outcome

Awarded value
£115,000
Award date
20 January 2026
Winner
  • Project Centre Limited

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    29 January 2026

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Essella Road Footbridge — won by Project Centre Limited — Skim