Skip to content
In deliveryUnited Kingdom

W722 - Longbridge Weir Hydroelectric Plant Maintenance

Published
Published 29 January 2026

Overview

The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning. The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of the original design and construction of the installation. Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-houremergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change.

Key details

Country
United Kingdom
Status
In delivery
Procedure
Direct
Published
29 January 2026

Award outcome

Awarded value
£730,000
Award date
7 January 2026
Contract period
31 March 2026 → 31 March 2031
Winner
  • DERWENT HYDROELECTRIC POWER LIMITED

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    1 April 2026

    View notice ↗
  2. Contract

    29 January 2026

    View notice ↗
  3. Contract

    29 January 2026

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: W722 - Longbridge Weir Hydroelectric Plant Maintenance — won by DERWENT HYDROELECTRIC POWER LIMITED — Skim