Contract signedUnited Kingdom

Toilets

Published
Published 17 November 2025

Overview

The works include the full strip-out, refurbishment, and reinstallation of sanitary fittings, finishes, and associated building and plumbing works to the existing toilet area. 1. Strip Out and Preparation a. Strip out and remove existing toilet, sink, and associated fittings. b. Carry out full demolition/soft strip of redundant fixtures, finishes, and pipework as required. c. Remove existing internal door and door furniture. d. Dispose of all waste materials in accordance with site waste management and environmental regulations. e. Make good all disturbed areas to a sound and even finish ready for decoration. 2. Windows a. Make good 2 no. existing windows, including repair of frames, cleaning, sealing, and preparation for decoration as required. 3. Decoration a. Prepare all wall, ceiling, and wood surfaces. b. Apply one mist coat and one full coat of quality trade emulsion to walls and ceilings. c. Apply suitable finish paint to all woodwork, trims, and window frames. 4. Joinery Works a. Refurbish existing door, including sanding, filling, repainting/staining, and fitting new door furniture (handle, lock, and signage). b. Install shelving to support new water heater - securely fixed, level, and able to support full load of the appliance. c. Construct and install heater cover (removable for access and maintenance), finished to match surrounding décor. d. Carry out any required boxing-in of pipework to provide a neat and accessible finish. 5. Plumbing Works a. Supply and install new close-coupled WC suite, including pan, cistern, seat, and all fixings. b. Supply and install new sink with thermostatic mixing tap. c. Supply and install new 15-litre electric water heater. d. Complete all associated pipework, waste, and lagging to meet current Building and Water Regulations. e. Pressure test system upon completion. 6. Mechanical Works a. Core hole through external wall for new extract fan installation (fan to be supplied separately or as specified). b. Seal all penetrations weather-tight and make good finishes. 7. Completion a. Ensure all works are clean, fully operational, and tested. b. Remove all rubbish and debris from site. c. Provide user instructions for all new equipment (heater, tap, etc.). d. Leave area ready for immediate use

Key details

Country
United Kingdom
Status
Contract signed
Published
17 November 2025

Award outcome

Awarded value
£42,600
Award date
10 November 2025
Winner
  • Internal Projects Limited

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    17 November 2025

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Toilets — won by Internal Projects Limited — Skim