Condensate Water Pipework System - Quantity Surveyor

Published
Published 25 September 2025

Overview

The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance. The existing system is designed to allow for one system to operate at any one time, not two systems. Therefore, only one system can be worked on at any one time. A Condenser Water bypass is to be installed within the Ground Floor plantroom. This is to allow for example system 1 chiller to operate with system 2 system, and vice versa. The project is currently at stage 4 and estimates a 52-week construction phase.

Key details

Country
United Kingdom
Status
In delivery
Procedure
Limited
Published
25 September 2025

Award outcome

Awarded value
£37,000
Award date
7 September 2025
Contract period
25 September 2025 → 31 December 2026
Winner
  • Oander

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    25 September 2025

    View notice ↗

Contracting authority

  • Guy's and St Thomas' NHS Foundation Trust

    Buyer

    London, United Kingdom

    GB-PPON: PDZC-6438-DGPX

    Authority website ↗

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Condensate Water Pipework System - Quantity Surveyor — won by Oander — Skim