In deliveryUnited Kingdom
Condensate Water Pipework System - Quantity Surveyor
- Published
- Published 25 September 2025
Overview
The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower. The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital.
The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance.
The existing system is designed to allow for one system to operate at any one time, not two systems. Therefore, only one system can be worked on at any one time. A Condenser Water bypass is to be installed within the Ground Floor plantroom. This is to allow for example system 1 chiller to operate with system 2 system, and vice versa.
The project is currently at stage 4 and estimates a 52-week construction phase.
Key details
- Country
- United Kingdom
- Status
- In delivery
- Procedure
- Limited
- Published
- 25 September 2025
Award outcome
- Awarded value
- £37,000
- Award date
- 7 September 2025
- Contract period
- 25 September 2025 → 31 December 2026
- Oander
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
25 September 2025
View notice ↗
Contracting authority
Guy's and St Thomas' NHS Foundation Trust
BuyerLondon, United Kingdom
GB-PPON: PDZC-6438-DGPX
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.