Skip to content
In deliveryUnited KingdomServices£2,000,000

Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets

Published
Published 7 August 2025
Deadline
Closed 25 November 2025

Overview

Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council. Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB). Until 2014, LRL had an anaerobic digestion (AD) process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM TCG 2020K V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid. The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. It is estimated that the gas engines were only used for approximately 10000 hours prior to being decommissioned, having being installed circa 2010. As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at: Lancashire Renewables Limited Farington Waste Recovery Park Sustainability Way Leyland PR26 6TB To facilitate this, 2 no. gas engines / gensets are required to be brought back into operational service at LRL's Leyland site. Therefore, the contract will include offsite initial refurbishment, delivery back to site, installation and testing, followed by ongoing service and maintenance. It is likely that the initial refurbishment and install back on site of the two gensets must be completed by 31/03/2026. It is possible that the same works may be undertaken, and hence the contract could require an additional 2 no. gas engines / gensets of the same manufacturer and model at LRL's Thornton facility. The contract will include provision for this, although it is to be decided at a later date whether this will be exercised.

Key details

Country
United Kingdom
Status
In delivery
Category
Services
Estimated value
£2,000,000
Procedure
Open
SME suitable
Yes
Published
7 August 2025
Questions by
14 November 2025
Deadline
Closed
Classification (CPV)
Gas appliance maintenance servicesRepair and maintenance services of generators

Award outcome

Awarded value
£2,000,000
Award date
12 January 2026
Contract period
19 December 2025 → 18 December 2029
Winner
  • GENSERV NORTHWEST LTD

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    6 March 2026

    View notice ↗
  2. Contract

    12 January 2026

    View notice ↗
  3. Tender Update

    13 November 2025

    View notice ↗
  4. Contract Notice

    8 October 2025

    View notice ↗
  5. Prior Information Notice

    7 August 2025

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets — won by GENSERV NORTHWEST LTD — Skim