Lot 2 - Biowaste training - Aerobic treatment
Awarded to Renewable Energy Association
Environment Agency(buyer)
- Published
- Published 13 June 2025
- Deadline
- Closed 10 July 2025
Tender documents
Skim pulls every file the buyer attaches to this process and extracts the requirements from it.
Documents as they publish
Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.
Overview
Contracting authority
- Environment AgencyBuyer
2 live opportunities · 122 awarded contracts
London, United Kingdom
GB-PPON: PNWW-1475-NYLN
Authority website ↗
Find the key decision makers
The people who scope, score and sign this contract — names, roles and how to reach them.
Lots (2)
Lot 1 – Anaerobic Treatment of Waste (T589)
At the end of the course delegates will be able to: • Identify the role of AD in energy security and describe the drivers of the AD market. • Describe the biochemistry of AD, including identifying and understanding the critical process monitoring parameters. • Identify the aspects of AD plant design. This should include plant & equipment design and installation in accordance with the Waste Treatment BREF and biowaste appropriate measures. • Identify waste feedstock management methods and describe the problem scenarios. • Identify examples of failures, explain the root cause of failures and the importance of good design and feedstock control. • Identify the role of Animal By-products regulations. • Evaluate process control measures at sites. This includes reviewing monitoring results to determine the consequences of poor control and the identification of instability within the AD process. • Identify the variety of AD technologies, including biogas upgrading technology and carbon capture. • Describe the requirements and environmental challenges from digestate storage, treatment & use. • Describe the role of end of waste quality protocols or resource frameworks for digestate. • Perform troubleshooting of problems. • Understand the health and safety risks associated with anaerobic digestion activities. • Perform competent and thorough technical regulatory assessments. • Identify the specific challenges posed by sewage sludge anaerobic digestion sites.
£85,600Won by Renewable Energy AssociationLot 2: Aerobic Treatment of Waste (T593)
At the end of the course delegates will be able to: • Identify the role of aerobic treatment of waste in the UK economy and describe its interaction with government policy (such as the Simpler Recycling reforms). • Identify the aspects of aerobic treatment site processes and plant design. This should include plant & equipment design and operation in accordance with the Waste Treatment BREF and biowaste appropriate measures. • Describe the biochemistry of composting in both open and closed systems. • Identify waste feedstock management methods and describe the problem scenarios. • Identify examples of failures, explain the root cause of failures and the importance of good design and feedstock control. • Identify the role of Animal By-products regulations in aerobic treatments of waste. • Evaluate critical process monitoring parameters. This includes reviewing monitoring results to determine the consequences of poor control and identification of instability within aerobic processes. • Identify the different aerobic treatment technologies including composting, MBT and thermophilic aerobic digestion (TAD) processes. • Describe the requirements and environmental challenges from compost storage, treatment & use. • Describe the role of end of waste quality protocols or resource frameworks for compost. • Perform troubleshooting of problems. • Perform competent and thorough technical regulatory assessments.
£85,600Won by Renewable Energy Association
Key details
- Country
- United Kingdom
- Status
- In delivery
- Category
- Services
- Estimated value
- £171,200
- Procedure
- Open
- SME suitable
- Yes
- Published
- 13 June 2025
- Questions by
- 26 June 2025
- Deadline
- Closed
Award outcome
- Awarded value
- £127,906
- Award date
- 23 January 2026
- Contract period
- 25 August 2025 → 25 August 2028
- Renewable Energy Association
Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
13 February 2026
Contract
13 February 2026
Contract Notice
13 June 2025
More from Environment Agency
Other contracts from the same contracting authority. 2 live opportunities · 122 awarded contracts on their hub.
Supply of Colorimetric Analysers to the Environment Agency
Deadline 11 November 2026
Ground Care, Agricultural and Plant Equipment for Defra Group Fleet Services
Deadline 22 October 2026
Nuclear Graduates 2026
Won by Energus
Awarded 14 October 2026
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
How to win this tender
Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.
See exactly how Skim’s agents do this →
Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.
Find tenders like this before your competitors do.
Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.