Skip to content
In deliveryUnited KingdomWorks£60,000,000

London Gateway Berth 5 Container Yard Construction

Published
Published 21 May 2025

Overview

London Gateway (LGW) is planning to develop a container storage yard at London Gateway Port. The yard is located at Berth 5 of the Port. The Works include, but are not limited to, the following elements for the construction of 10 ASC modules on Berth 5 Yard, which are split between works designed by the Employer and works to be designed by the Contractor: Civil and Structure Works (Employer Designed) a) Heavy duty pavements including preparation of subgrade by high energy impact compaction (HEIC) to receive the pavement structure and associated edge restraints b) ASC rails, foundations and cable matt c) ASC buffer foundations and buffers d) Container plinths e) Reefer plinths and frames f) All tie-ins with the Berth 5 quay works, the Berth 4 works and other adjacent works. g) Surface water and hazardous drainage and associated pits h) HV, LV and communications conduits and associated pits i) Potable and fire water mains and associated pits and valves j) Sign post bases and signage k) Line marking l) Fencing and gates and associated controls m) Lightning protection earthing system n) Kerbs, ductwork, metalwork and specialist infrastructure to the landside and waterside interchange areas o) All tie-ins between the port access road and adjacent works p) Reefer and ASC substation buildings including foundations q) Light tower bases, light tower masts, fittings and fixtures. r) Potable and Fire water pumphouses Electrical Works (Design and Construct) a) Cabling works b) Installation of electrical control and protection systems c) Berth 5 ASC / Reefer substations including all switchgear and transformers d) 11kV electrical power installations to ASC cranes e) 11kV electrical power installations to Reefer f) SCADA control and monitoring systems g) LV electrical distribution and installation works including lighting network h) Installation of electrical control and protection systems

Key details

Country
United Kingdom
Status
In delivery
Category
Works
Estimated value
£60,000,000
Procedure
Selective
Published
21 May 2025
Questions by
16 June 2025
Classification (CPV)
Works for complete or part construction and civil engineering work

Award outcome

Awarded value
£52,270,000
Award date
18 March 2026
Contract period
1 December 2025 → 30 June 2027
Winner
  • GOBION CONSTRUCTION LTD

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    18 March 2026

    View notice ↗
  2. Contract Notice

    21 May 2025

    View notice ↗

Contracting authority

  • LONDON GATEWAY PORT LIMITED

    Buyer

    London, United Kingdom

    GB-COH: 04341592

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: London Gateway Berth 5 Container Yard Construction — won by GOBION CONSTRUCTION LTD — Skim