In deliveryUnited KingdomWorks£10,400,000
Digbeth (Tea Factory) - FIT OUT
- Published
- Published 16 May 2025
Overview
The requirement is summarised below:
The BBC are looking to appoint a contractor to carry out fit-out works at their new home at The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox. Staff are expected to move from The Mailbox to The Tea Factory in 2027.
Stoford (with BAM) started redeveloping The Tea Factory from a derelict building to a Shell and Core office1 in January 2024. They are making good progress and expect to complete their works in late December 2025.
1 As part of the Shell and Core, Stoford and BAM are also building the walls and lids to the Technical Rooms (i.e., Studios, Edit Suites, etc).
The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026.
The fit-out is over four floors (Ground, 1, 2 and 3) with a plant area on the roof. The scope of fit-out works includes:
• Finishes (including acoustics) to the Technical Rooms:
o 8x Radio Studios.
o 10x Edit Suites.
o 1x TV Studio.
o 1x TV Studio Gallery.
o 1x Lecture Theatre.
o 4x Apparatus Rooms.
• Construction of Radio Drama Studio and Control Room including a ‘Dead Room’.
• Construction of six meeting rooms with structural lids.
• All M&E to the floor plates and all rooms / spaces.
• Raised access floor.
• Acoustic finishes.
• Wall and floor finishes.
• FF&E (excluding technical rooms).
Design of the works has been progressed to RIBA Stage 4 by BBC Workplace with support from the following consultants:
• J4 Projects Project Managers
• MGAC Cost Consultant
• AWW Architects
• IDSR Interior Designers
• CMB MEP Design
• Arup Structural Engineer
• Ion Acoustics Acousticians
The works will be procured under the JCT 2024 D&B Contract.
The BBC does not intend to novate the designers to the contractor; however, it may be acceptable for the contractor to directly appoint the designers if they (a) deem it to be beneficial for the project and (b) can demonstrate that any associated risks (e.g., conflicts of interest) can be mitigated.
Key details
- Country
- United Kingdom
- Status
- In delivery
- Category
- Works
- Estimated value
- £10,400,000
- Procedure
- Selective
- SME suitable
- Yes
- Published
- 16 May 2025
- Questions by
- 9 June 2025
Building alteration work
Award outcome
- Awarded value
- £10,400,000
- Award date
- 27 October 2025
- Contract period
- 15 December 2025 → 30 September 2026
- Overbury Plc
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
30 October 2025
View notice ↗Contract Notice
16 May 2025
View notice ↗
Contracting authority
BBC (British Broadcasting Corporation)
BuyerLondon, United Kingdom
GB-PPON: PJRB-3233-GTQL
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.