In deliveryUnited KingdomWorks£10,400,000

Digbeth (Tea Factory) - FIT OUT

Published
Published 16 May 2025

Overview

The requirement is summarised below: The BBC are looking to appoint a contractor to carry out fit-out works at their new home at The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox. Staff are expected to move from The Mailbox to The Tea Factory in 2027. Stoford (with BAM) started redeveloping The Tea Factory from a derelict building to a Shell and Core office1 in January 2024. They are making good progress and expect to complete their works in late December 2025. 1 As part of the Shell and Core, Stoford and BAM are also building the walls and lids to the Technical Rooms (i.e., Studios, Edit Suites, etc). The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026. The fit-out is over four floors (Ground, 1, 2 and 3) with a plant area on the roof. The scope of fit-out works includes: • Finishes (including acoustics) to the Technical Rooms: o 8x Radio Studios. o 10x Edit Suites. o 1x TV Studio. o 1x TV Studio Gallery. o 1x Lecture Theatre. o 4x Apparatus Rooms. • Construction of Radio Drama Studio and Control Room including a ‘Dead Room’. • Construction of six meeting rooms with structural lids. • All M&E to the floor plates and all rooms / spaces. • Raised access floor. • Acoustic finishes. • Wall and floor finishes. • FF&E (excluding technical rooms). Design of the works has been progressed to RIBA Stage 4 by BBC Workplace with support from the following consultants: • J4 Projects Project Managers • MGAC Cost Consultant • AWW Architects • IDSR Interior Designers • CMB MEP Design • Arup Structural Engineer • Ion Acoustics Acousticians The works will be procured under the JCT 2024 D&B Contract. The BBC does not intend to novate the designers to the contractor; however, it may be acceptable for the contractor to directly appoint the designers if they (a) deem it to be beneficial for the project and (b) can demonstrate that any associated risks (e.g., conflicts of interest) can be mitigated.

Key details

Country
United Kingdom
Status
In delivery
Category
Works
Estimated value
£10,400,000
Procedure
Selective
SME suitable
Yes
Published
16 May 2025
Questions by
9 June 2025
Classification (CPV)
Building alteration work

Award outcome

Awarded value
£10,400,000
Award date
27 October 2025
Contract period
15 December 2025 → 30 September 2026
Winner
  • Overbury Plc

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    30 October 2025

    View notice ↗
  2. Contract Notice

    16 May 2025

    View notice ↗

Contracting authority

  • BBC (British Broadcasting Corporation)

    Buyer

    London, United Kingdom

    GB-PPON: PJRB-3233-GTQL

    Authority website ↗

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Digbeth (Tea Factory) - FIT OUT — won by Overbury Plc — Skim