In deliveryUnited KingdomWorks£720,000

Bass Rock Refurbishment 2025 - 2027

Published
Published 14 May 2025
Deadline
Closed 6 August 2025

Overview

We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds, including 40,000 gannets. The island is accessed from North Berwick by boat with a concrete path leading from the steps at the boat landings up to the lighthouse through the ruins of the Castle walls. We require a competent contractor to carry out the scope of works as below, these are initial requirements and they may be added to in the tender documents. Lighthouse Tower refurbishment - Painting, internal and external – full building externally, decoration internally Glazing repairs – replacing window panes in light room Electrical upgrades – installation of new light, batteries and solar array Installation of HCL on roof dome Safety gates installed Asbestos testing Free issue equipment and detailed scope will be confirmed in the tender documents. External refurbishment Winch house at side of lighthouse tower to be removed, asbestos present in the roof Drainage – courtyard drainage repairs Wall removal Minor repairs to access landing and steps Bird guano removal Full details of the works will be given in the Tender documents. Contractors will need to confirm their competence in working at height, electrical works, and health and safety and environmental management. Due to nature Scotland restrictions in relation to bird nesting, access to Bass Rock for the works can only be between October and January every year. We expect these works to be carried out between these months in both 2025/26 and 2026/27. Access day to day will be by boat from the mainland, to be arranged by the awarded contractor. There are no toilets, overnight or fresh running water facilities on this site. Due to these limited welfare facilities and the PPE required to work on site, the works need to be carried out on site to a maximum of 4 hours per day. We will require all interested contractors to attend a mandatory site visit on 16th July 2025. We expect the following PPE to be supplied by NLB for this site visit – boat suits, breathing apparatus, lifejackets, personal locator beacons (PLB), Manta helmets. Interested suppliers are to wear waterproof footwear and clothing. Timeline Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the NLB does not intend to depart from the timetable, it reserves the right to do so at any time. Issue of Invitation to Tender - 3rd July 2025 Site Visit - 16th July 2025 Clarification deadline - 24th July 2025 Tender return deadline - 6th August 2025 Tender Award - Estimated by mid-end August 2025 Tools and materials to Oban - By 10th October 2025 Contract start - 21st October 2025 To view this notice, please click here: https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=981019939

Key details

Country
United Kingdom
Status
In delivery
Category
Works
Estimated value
£720,000
Procedure
Open
SME suitable
Yes
Published
14 May 2025
Questions by
5 August 2025
Deadline
Closed
Classification (CPV)
Ground-drainage workDismantling worksWorks for complete or part construction and civil engineering workAsbestos-removal workElectrical wiring workElectrical engineering installation worksPainting and glazing workPainting work of buildings

Award outcome

Awarded value
£550,000
Award date
4 September 2025
Contract period
31 August 2025 → 1 February 2027
Winner
  • Accted Engineering

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    17 September 2025

    View notice ↗
  2. Contract Notice

    3 July 2025

    View notice ↗
  3. Prior Information Notice

    14 May 2025

    View notice ↗

Contracting authority

  • Northern Lighthouse Board

    Buyer

    Edinburgh, United Kingdom

    GB-PPON: PMGV-7529-QWXG

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Bass Rock Refurbishment 2025 - 2027 — won by Accted Engineering — Skim