In deliveryUnited KingdomServices£500,000
Western Range Town Planning Consultant
- Published
- Published 2 May 2025
- Deadline
- Closed 30 May 2025
Overview
The project is focused on the Western Range, a substantial part of the estate that is in urgent need of both repair and re-imagining. This offers the Museum an opportunity to make a statement of its future intent, through reimagined galleries, new state-of-the-art storage facilities and engaging contemporary architecture, in juxtaposition to the highly significant and already celebrated listed buildings on the site.
Despite appearing as a single entity, the Western Range comprises a miscellany of separate buildings which have been added to Robert Smirke's original Grade I listed Museum; as a result, the exact extent of the red-line boundary and phasing for this project is dependent on a number of interlocking considerations. The proposed project outline can be seen in the attached documentation. In the region of 15,000m2, it accounts for almost 15% of the floor space within the Bloomsbury site, in a warren of inflexible and static rooms. Further, recent surveys indicate that the existing building fabric and infrastructure are in a state that is below modern expectations. It comprises around 7,500m2 of gallery space and currently houses the Ancient Egypt, Ancient Greece (including the Parthenon Sculptures), Rome, and Ancient Assyria and Middle East collections, along with 4,500m2 of back-of-house collection storage.
Working with the Museum, the Town Planning Consultant will work with the design team to deliver an architecturally significant, long-lasting, robust intervention, founded on an effective approach to sustainability. This will address the shortcomings of the existing buildings, while delivering the first phase of the reimagined display of collections in new, permanent gallery spaces, alongside modern-day visitor experiences and back-of-house facilities, all within a built environment that is simple and effective in its design and management. Addressing the challenges posed by the condition of the existing buildings and infrastructure will require sensitivity, careful intervention and complex, intricate design solutions.
The Consultant will:
Review RIBA Stage 0/1 documentation to identify parameters for the Strategic Brief.
Support the development of the Concept Design and Planning Strategy through RIBA Stage 2.
Support development of the preferred option through RIBA Stages 3 and 4.
Lead on coordination and production of the Planning Application documents.
Manage submission of the Planning Application and activities as required throughout the Determination phase and discharge of an pre-commencement conditions.
Full scope details are provided in the procurement documents
Key details
- Country
- United Kingdom
- Status
- In delivery
- Category
- Services
- Estimated value
- £500,000
- Procedure
- Open
- SME suitable
- Yes
- Published
- 2 May 2025
- Questions by
- 21 May 2025
- Deadline
- Closed
Urban planning services
Award outcome
- Awarded value
- £189,754
- Award date
- 23 July 2025
- Contract period
- 30 June 2025 → 30 June 2028
- NEWMARK GERALD EVE LLP
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
24 July 2025
View notice ↗Contract Notice
2 May 2025
View notice ↗
Contracting authority
TURNER & TOWNSEND PROJECT MANAGEMENT LIMITED
Procuring entityLeeds, United Kingdom
GB-COH: 02165592
Authority website ↗British Museum
BuyerLondon, United Kingdom
GB-PPON: PCDW-8715-VGZT
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.