Skip to content
In deliveryUnited KingdomServices£9,500,000

UKRI-4453 BAU Professional Services Framework

Awarded to ADP ARCHITECTURE LIMITED, ARCADIS CONSULTING (UK) LIMITED, ATKINSRÉALIS UK LIMITED +17 more

UK Research and Innovation(buyer)

Published
Published 30 April 2025
Deadline
Closed 20 July 2025

Tender documents

Skim pulls every file the buyer attaches to this process and extracts the requirements from it.

Documents as they publish

Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.

View tender files

Overview

UK Research and Innovation (UKRI-STFC) established a professional services framework agreement valued at £76 million, awarded to 20 suppliers in September 2025, to support the Business-as-Usual capital delivery programme. The framework encompasses eight lots covering project and programme management, cost management, design services, architecture, civil and structural engineering, mechanical and electrical services, sustainability consulting, and NEC supervision to streamline procurement and enable efficient project delivery.

Contracting authority

Find the key decision makers

The people who scope, score and sign this contract — names, roles and how to reach them.

Lots (8)

  • Lot 1 Project & Programme Management

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** The Project Manager is responsible directly to the Client for his actions and will act independently of, but collaboratively with, all other consultants, the Contractor and Tier1-3 supply chain and provide all services appropriate to the role, with expertise and responsibilities including but not limited to those listed herein and will include compliance with latest Cabinet Office initiatives using Building Information Modelling (BIM) and Government Soft Landings (GSL). The Project Manager will support the procurement the surveys, full design team, Contractor and any additional services that are required to deliver this project complete and operational. The design team disciplines will contract directly with STFC for RIBA Stages 2 to 7. The PM will coordinate meetings, prepare, and circulate project meeting agendas and minutes, prepare reports and supporting documents, track actions, assemble monthly construction board papers, prepare internal monthly Project Reports (PRC report) as directed by UKRI/STFC. They will also coordinate the production and presentation of information for the Client to use at Commercial Assurance Board Gateways, SRO Gateway Reviews and RIBA Stage Gateway Reviews to enable the project to be signed off and funding approved by the Government. To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by ARCADIS CONSULTING (UK) LIMITEDWon by CPC Project Services LimitedWon by Savills (UK) Limited
  • Lot 2 Cost Management/Quantity Surveying

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** The Cost Manager is responsible directly to the Client for his actions and will act independently of, but collaboratively with, all other consultants. The Cost manager will be responsible for keep record of all transactions / orders on the project and to work with STFC finance to obtain records and track monthly spend and yearly cashflow projections up to date on all project related costs, both build and client costs. The Project Budget includes everything related to delivering the project. Provide cashflow/ draw down schedules for all RIBA Stages/ month end against the agreed programme and agree with the Project Manager.  The Cost Manager shall act as the Cost Manager and provide all services appropriate to the role, with expertise and responsibilities including but not limited to those listed herein and will include compliance with latest Cabinet Office initiatives using Building Information Modelling (BIM) and Government Soft Landings (GSL). To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by GLEEDS LLPWon by ARCADIS CONSULTING (UK) LIMITEDWon by Lexica Health and Life Sciences Consultancy Limited
  • Lot 3 Lead Designer BSA PD & CDM PD

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** Lead on developing the design responsibility matrix (DRM) with input from the other consultants. With the other consultants, review and update the DRM to incorporate the design outputs of the Contractor and the specialist subcontractors. Provide cashflow/ draw down schedules for all RIBA Stages/month end against the agreed programme and agree with the Project Manager.  To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by OBERLANDERS ARCHITECTS LLPWon by FEILDEN CLEGG BRADLEY STUDIOS LLPWon by NBBJ LTD.
  • Lot 4 Architectural

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** Together with the Lead Designer, provide input and agree to the project’s BIM execution plan and clash detection strategy. As a minimum: Produce (2D/3D) data models within the specified BIM/authoring software as agreed with the project team Utilise the PM instructed central data repository eg. Common Data Environment (CDE) or SharePoint website for the sharing of models, drawings, specifications and key project information. Conduct regular clash detection workshops, in accordance with the agreed clash detection strategy, every 2 to 4 weeks (to be agreed with the client), and providing reports to the client demonstrating resolution. Each consultant must carry out their own clash detection of their design against other consultants’ models, to the same frequency. Major clashes need to be highlighted to the client to discuss for changes. For radiation designated projects, full coordination of penetrations within these zones must be coordinated with the client team, and the client’s radiation protection advisor.  Client is to receive PDF and .dwg files of all drawings upon completion of each RIBA work stage. The .dwg files are to be provided (or exported if necessary) with drawing layers formatted in compliance with ISO 13567 (as noted in ISO 19650-2) and are to be fully compatible with AutoCAD. To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by STRIDE TREGLOWN LIMITEDWon by FRANCIS-JONES CARPENTER LIMITEDWon by ADP ARCHITECTURE LIMITED
  • Lot 5 Civil and Structural

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** The Structural and Civil Engineer along with the Lead Designer, the Project Manager, Client and their representatives, other consultants and all stakeholders will work closely together to foster a highly collaborative culture. The culture will embody the principles of mutual trust and co-operation with an overall aim of delivering outcomes specified in the Project Brief and consequently a successful project on time and to budget. Assist with the creation and maintenance of relevant project tools, project directory, responsibilities matrices, risk registers, project execution plan, stakeholder mapping, change control procedures, master project programme etc.   Assist with the development of a phasing strategy, if required.   Provide cashflow/ draw down schedules for all RIBA Stages/month end against the agreed programme and agree with the Project Manager.  Where the Client has indicated the possibility of a change to the agreed brief during the design phase, inform the Client of the cost and programme implications and obtain the Client’s instructions.  Carry out any redesign work as instructed by the Project Manager. With the other members of the Project Team, consider the most suitable options for the procurement of the Works, make recommendations to the Client.  With the other consultants, advise the Project Manager of the cost and programme effects of any subsequent design changes.  To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by RIDGE AND PARTNERS LLPWon by PRICE & MYERS LLPWon by PELL FRISCHMANN CONSULTANTS LIMITED
  • Lot 6 Mechanical, Electrical and Public Health

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** The MEPH Consultant shall provide a monthly progress and status report throughout all stages. As a minimum this will include progress, information required, decisions taken, documentation reviewed, documentation issued. The MEPH consultant along with the Lead Consultant, the Project Manager, Client and their representatives, other consultants and all stakeholders will work closely together to foster a highly collaborative culture. The culture will embody the principles of mutual trust and co-operation with an overall aim of delivering outcomes specified in the ‘Strategic Outline Case’ and consequently a successful project on time and to budget.  Comply with and maintain project management procedures, hierarchy of responsibility and lines of communication for the exchange of information between the Client and respective Consultants, Contractor, sub-contractors, and others concerned in the project to allow them to work closely as a team. This will include producing or inputting into common documentations maintained by the Project Manager such as risk registers, CDM compliance trackers, Building Regulations trackers, RFIs, Early warnings and any other trackers deemed necessary to manage the projects design, compliance and risks. Participate in the operation of an Early Warning system whereby the Project Manager shall notify all others as soon as the Project Manager is aware of a matter adversely affecting the Project or its own performance. To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by SERVICES DESIGN SOLUTION LTDWon by RIDGE AND PARTNERS LLPWon by ATKINSRÉALIS UK LIMITED
  • Lot 7 Sustainability and Carbon

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** Advise the Client as to the need for any specialist consultants in relation to health or safety. Provide cashflow/ draw down schedules for all RIBA Stages/ month end against the agreed programme and agree with the Project Manager. Take account of, and incorporate where applicable, the ESMAPS and SHE Codes produced by STFC that describe the required health and safety standards for our estate. Take account of, and incorporate where applicable, the fire safety regulations and statutory processes described in the Building Safety Act 2022. Operate a quality management system that follows the guidance set out in ISO 9001. Operate an environmental management system that follows the guidance set out in ISO 14001. To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by SCOTCH PARTNERS LLPWon by FEILDEN CLEGG BRADLEY STUDIOS LLPWon by ATKINSRÉALIS UK LIMITED
  • Lot 8 NEC Supervisor

    **PLEASE NOTE THAT THE BID SUBMISSION DEADLINE FOR THIS REQUIREMENT IS NOW 30 JUNE 1400HRS UK TIME. THE LATER DATE STATED FURTHER DOWN THIS NOTICE IS INCORRECT (20/07) AND IS UNABLE TO BE CHANGED DUE TO AN UNFORESEEN FTS/WEBPAGE TEMPLATE ERROR** Where internal STFC Clerk of Works (CoW) support is in place: Lead inspections and reporting, with CoW attending for additional discipline or Estates assurance. Coordinate sharing of witnessing schedules and site access logistics. Agree a unified defects list at handover and during the defect correction period. Ensure that all inspection activities are clearly distinguished by role (e.g. NEC vs. Estates client duties) and follow contract communication protocols. CoW observations may support Supervisor reporting but do not replace the formal inspection or notification procedures defined under the NEC contract. Provide timely updates to the Project Manager to ensure the health of the quality on the project is clearly understood. Ensure this is reported to the Client by contributing to the monthly progress meeting reports. To bid please visit the Lot specific link below; Lot 1 - https://ukri.delta-esourcing.com/respond/UQAZMN2VQN Lot 2 - https://ukri.delta-esourcing.com/respond/H6R2WVBP4Z Lot 3 - https://ukri.delta-esourcing.com/respond/49Q3VBRBUX Lot 4 - https://ukri.delta-esourcing.com/respond/N2G5263X7V Lot 5 - https://ukri.delta-esourcing.com/respond/A796WQZFS3 Lot 6 - https://ukri.delta-esourcing.com/respond/W45VAS96TB Lot 7 - https://ukri.delta-esourcing.com/respond/TUPUQ57X95 Lot 8 - https://ukri.delta-esourcing.com/respond/7H56C4T248

    £9,500,000Won by HICKTON QUALITY CONTROL LTDWon by EEDN LTDWon by WESSEX SITE INSPECTION LTD

Key details

Country
United Kingdom
Status
In delivery
Category
Services
Estimated value
£9,500,000
Procedure
Open
SME suitable
Yes
Published
30 April 2025
Deadline
Closed
Classification (CPV)
Advisory architectural servicesConsultative engineering and construction servicesCivil engineering support servicesEnvironmental impact assessment for constructionMechanical and electrical engineering servicesConstruction supervision servicesConstruction consultancy servicesConstruction project management services

Award outcome

Awarded value
£76,000,000
Award date
21 September 2025
Contract period
3 August 2025 → 3 August 2027
Winners
  • ADP ARCHITECTURE LIMITED
  • ARCADIS CONSULTING (UK) LIMITED
  • ATKINSRÉALIS UK LIMITED
  • CPC Project Services Limited
  • EEDN LTD
  • FEILDEN CLEGG BRADLEY STUDIOS LLP
  • FRANCIS-JONES CARPENTER LIMITED
  • GLEEDS LLP
  • HICKTON QUALITY CONTROL LTD
  • Lexica Health and Life Sciences Consultancy Limited
  • NBBJ LTD.
  • OBERLANDERS ARCHITECTS LLP
  • PELL FRISCHMANN CONSULTANTS LIMITED
  • PRICE & MYERS LLP
  • RIDGE AND PARTNERS LLP
  • SCOTCH PARTNERS LLP
  • SERVICES DESIGN SOLUTION LTD
  • STRIDE TREGLOWN LIMITED
  • Savills (UK) Limited
  • WESSEX SITE INSPECTION LTD

Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    15 October 2025

  2. Tender Update

    25 June 2025

  3. Tender Update

    27 May 2025

  4. Contract Notice

    30 April 2025

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

How to win this tender

Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.

See exactly how Skim’s agents do this →

Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.

Find tenders like this before your competitors do.

Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.