Skip to content
SkimSkim home
In deliveryUnited KingdomWorksFramework agreement£9,000,000,000Add to pipeline

DV4 Enterprise

Awarded to AECOM Limited, Farrans Limited, M Group Water (Network Infrastructure) Ltd +4 more

Scottish Water(buyer)

Published
Published 25 November 2024
Deadline
Closed 6 January 2025

Tender documents

Skim pulls every file the buyer attaches to this process and extracts the requirements from it.

Documents as they publish

Specification, evaluation criteria, pricing schedules and every requirement — extracted, searchable and mapped to your response.

View tender files

Overview

Scottish Water has awarded a £9 billion enterprise partnership contract for the delivery of its SR27 and SR33 capital investment programmes spanning 2027 to 2039. Seven companies—AECOM Limited, Farrans Limited, M Group Water (Network Infrastructure) Ltd, Mott MacDonald Bentley Ltd, Ross-shire Engineering Limited, Stantec UK Ltd, and WGM Engineering—have been appointed as Asset Delivery Partners and Primary Designers to work in integrated teams under an outcome-based partnering model. The contract runs for seven years until March 2033 with an option to extend for a further six years, incorporating CDM 2015 compliance, KPI-driven performance thresholds, and alignment with Scottish Water's health, safety, and net-zero ambitions.

Contracting authority

Find the key decision makers

The people who scope, score and sign this contract — names, roles and how to reach them.

Lots (2)

  • Lot 1 - Primary Designer(s)

    Scottish Water is seeking to appoint a strategic partner(s) for the provision of Primary Designer services. This will provide assistance with the Strategic programme development, design and delivery of its Investment Programme and will cover improvement works associated with all Water and Wastewater assets across Scotland. This may include new assets, renewals, modification, maintenance, refurbishments, extensions and enhancements to existing assets. It is a requirement that bidders must be capable to act as the Principal Designer role under the Construction, Design and Management (CDM) 2015 Regulations, this includes pre construction responsibilities. <br/><br/>Estimated contract value across the framework for a 13 year period, expected to commence April 2026 is in the range of £600 million to £1.3bn. <br/>The Primary Designer will be engaged to provide strategic support, studies, design and technical services at pre, during and post construction, ensuring successful delivery of infrastructure and non-infrastructure programs. They will enhance and maintain a standard design and product library driving process engineering, Nature Based Solutions (NBS) and low carbon products and processes. The Primary Designer will maximise the use of repeatable designs and processes to deliver projects ensuring successful delivery of infrastructure and non-infrastructure programmes of work.<br/>The appointed primary designer(s) is expected to work with Scottish Water and Enterprise Partners over the duration of this agreement to develop effective collaboration, which may include the negotiation of incentive mechanisms, sharing of risk, co-location with multi-agency teams and secondment.<br/><br/>SW Primary designer will be required to support the Enterprises end to end processes, the Partner(s) that will provide Scottish Water’s Primary Designer services will support:<br/><br/>• Support Scottish Water Scottish Water Strategic Ambitions of; Service excellence, Beyond net zero emissions and Great value and financial sustainability.<br/>• The design and development of solutions for delivery by framework delivery partners or tendered contractors.<br/>• Create and develop design specifications, drawings, and technical documentation.<br/>• Collaborate with internal teams to align designs with operational and maintenance requirements.<br/>• Holds end to end accountability for project design.<br/>• Ensure compliance with SW requirements, relevant industry standards and regulations.<br/>• Manage Scottish Water’s standard products and design library whilst working with the wider SW supply chain.<br/>• Integration of Primary Designer outcomes with Common Data Environment (CDE) as required ensuring compliance with key areas e.g. file locations, file integrity, format etc<br/>• Drive standardisation in design and design management, low carbon products and processes and innovation across programmes and supply chains.<br/>• The study, investigation, data collection, modelling and identification of water and wastewater service related performance improvement requirements. <br/>• The provision of modelling support to inform the design and development of solutions.<br/>• The auditing and assessment of water and wastewater models developed by others.<br/>• Project management support and resources<br/>• The development and assessment of traditional and innovative asset and operational based solutions, feasibility studies, and investment appraisals to support decision making by the client.<br/>• Technical support<br/>• Provide expert technical advice and design support throughout the project lifecycle, from conception to completion providing buildability/delivery plan input and client design assurance. Develop outline plans and requirements to commission the projects being developed and how standard products will be commissioned - standard commissioning.<br/>• Provide expertise on an ‘as needed’ basis to ensure knowledge transfer and continuity of design support.<br/>• Provide digital handover packages and configure asset information, ensuring lessons learned are recorded.<br/>• Supply technically qualified professionals to be seconded to the water utility for defined periods to support in-house teams.<br/>• Undertake environmental impact assessments, studies, risk analyses, and technical evaluations as needed.<br/>• Evaluate alternative solutions for system upgrades or new infrastructure, providing recommendations based on cost, feasibility, and performance.<br/>• Support the client through strategic consultancy advice, including digital engineering / assembly techniques opportunities e.g. digital twin, rehearsal.<br/>• Provide expertise to support the understanding of future climate impacts on Scottish Waters assets and environment to ensure that systems and services are resilient to climate change.<br/><br/>The Primary Designer is responsible for design and takes accountability for design across the project lifecycle working with the integrated high performing Enterprise team it is a part of. The Primary Designer assesses the most effective way to deliver outcomes i.e. prioritises no build, less build / alternative solutions, efficient build. The Primary Designer works with the supply chain to identify and develop standardisation and alternative low carbon opportunities and agree Asset Delivery Partner or supply chain led elements of the design. The Primary Designer supports Client with asset planning and asset strategy/policy and standards.

    £1,300,000,000Won by AECOM LimitedWon by Stantec UK Ltd
  • Lot 2 - Asset Delivery Partners

    Scottish Water is seeking to appoint Asset Delivery Partners (ADPs) which will be accountable for driving programme/project delivery, liaising with the Enterprise Primary Designer and Integrator functions to perform Design & Build activities, while adhering to standardised designs. The ADP manages day-to-day activities during construction and coordinates the works with Scottish Water Operations until the point of asset handover.<br/><br/>Scottish Water is seeking to appoint suitably experienced Civils, Infrastructure and MEICA (Including Process Engineering capability) Asset Delivery Partners to deliver our SR27 and SR33 programme of capital works under an outcome-based Enterprise model. Works may include new assets and renewals, surveys and inspections, modifications, complex maintenance, refurbishments, extensions, and enhancements to existing assets. More specifically, the programmes of work based on the SR27 forecast include:<br/><br/>Design and construction of complex and non-complex civil engineering, mechanical, electrical, hydraulic, telemetry, control, instrumentation, and commissioning as required. This support will include works associated with new assets, renewals, modification, maintenance, and refurbishment of water and wastewater networks including mains rehabilitation and lining, sewerage networks, pumping stations and process works including mechanical, electrical, instrumentation and commissioning. The programme pipeline in SR27 includes but is not limited to UID and Flooding Network Capital Maintenance, Waste Water Treatments Works (WWTW) Upgrades & Growth, WWTW Capital Maintenance, Water Networks and new and replacement Pipelines, cleaning and maintenance, Water Treatment Works (WTW) upgrades & Capital Maintenance, Treated Water Storage build and repair.<br/><br/>We are looking for bidders who are committed to working in a safe, collaborative, and flexible way, who will support our drive for increased cost, carbon, time and standardisation efficiencies and who hold the appropriate capability and resources to help us deliver our strategic ambitions of Beyond Net Zero, Service Excellence and Great Value and Financial Sustainability. Successful bidders must be able to safely carry out Principal Contractor responsibilities and will be required to evidence their experience and capabilities in design and build activities for large and complex projects as well as operational requirements such as but not limited to; major water bursts, major sewer collapses and leakage support. Bidders must only bid as single entities and not as joint ventures or consortium. <br/><br/>The framework will be awarded from 2026-2033, with extension options, at client discretion based on business requirements, up to 2039. The estimated net value range of this procurement is £4bn - £7.7bn. Ranges are based on 2024 pricing and as such, Scottish Water reserves the right to index these values over the duration of the procurement. Successful partners will get an allocated share of this work as part of the advanced partnering approach. <br/><br/>Scottish Water reserves the right to augment the supply chain during SR27 to support emerging SR33 needs. SR33 is the period from 1st April 2033 until 31st March 2039. To facilitate this, a mid-point review of the SR27 supply chain will be conducted in 2030 and the current supply chain capacity and capability will be assessed at this time to ensure business requirements will be met. Based on the outcome of the review, Scottish Water reserves the right to procure additional/alternative supply chain contractor partners, as required.<br/><br/>The scope of the ADP (Lot 2) will be further divided into three sub-lots:<br/>2a) Civils <br/>• indicative works include creation of above or below ground civil structures e.g. storm tanks and treated water storage tanks.<br/>2b) Infrastructure<br/>• indicative works include installation of new pipework, replacement pipework, refurbished pipework or major repairs of water and sewer pipework, and water pipe lining.<br/>2c) Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) - including Process Engineering, Commissioning Engineering and Smart Technology/Internet of Things (IoT).<br/>•Mechanical: This involves the design, installation and maintenance of mechanical systems including pumps, piping and treatment processes.<br/>• Electrical: This includes electrical site cabling, motor control centres (MCCs) and other electrical installations.<br/>• Instrumentation: This covers the devices and systems used to measure and control variables like flow, temperature, pressure and quality<br/>• Control: This includes operational technology, systems and software used to control and automate operational processes.<br/>• Automation: This refers to the integration of various systems to automate processes, improving efficiency and reliability including AI and data analytics.<br/>• Process Engineering: The includes the design, installation, integration and commissioning of process equipment to treat water and wastewater to the required standards for supply to customers or discharge to the environment.<br/>• Commissioning Engineering: Ensures that systems and components are designed, installed, tested, operated, and maintained according to the operational requirements of the client.<br/>• Smart Technology / IoT: Ability to design, install and commission smart technologies and IoT systems, including selecting appropriate technology, sensors, devices, and communication protocols. Ensuring these are integrated into site industrial control systems and connected to top-end communication and corporate data platforms.<br/><br/>These lots will be evaluated separately, and bidders are able to bid on one or multiple sub-lots. Bidders may be awarded more than one sub-lot.

    £7,700,000,000Won by WGM EngineeringWon by Mott MacDonald Bentley LtdWon by Farrans LimitedWon by Ross-shire Engineering Limited (RSE)Won by M Group Water (Network Infrastructure) Ltd

Key details

Country
United Kingdom
Status
In delivery
Category
Works
Estimated value
£9,000,000,000
Procedure
Selective
Contract type
Framework agreement
Published
25 November 2024
Deadline
Closed
Classification (CPV)
Engineering works and construction worksConstruction work for water projectsEngineering design services

Award outcome

Awarded value
£9,000,000,000
Award date
19 March 2026
Contract period
— → 10 January 2039
Winners
  • AECOM Limited
  • Farrans Limited
  • M Group Water (Network Infrastructure) Ltd
  • Mott MacDonald Bentley Ltd
  • Ross-shire Engineering Limited (RSE)
  • Stantec UK Ltd
  • WGM Engineering

Contract ending soon? Skim tracks incumbents and flags recompetes early. Start for Free to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    25 March 2026

  2. Contract Notice

    25 November 2024

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

How to win this tender

Skim reads the notice and every document attached to it, scores the fit against your company profile for a clear bid or no-bid call, then drafts each answer from your own evidence and past bids. You review, refine and submit — on time, with every requirement covered.

See exactly how Skim’s agents do this →

Comparing platforms? Skim is set against the alternatives for pre-tender intelligence, tender management software and bid management software.

Find tenders like this before your competitors do.

Skim scans every portal daily and scores each tender against your profile. Start for free and see the tenders you are missing.

AECOM Limited +6 won DV4 Enterprise