Skip to content
AwardedUnited KingdomServices£53,004

Pont Ends River Restoration: Detailed Design

Published
Published 28 October 2025
Deadline
Closed 24 September 2025

Overview

The Pont and Blyth Rivers flow eastwards through south Northumberland, entering the North Sea at the town of Blyth. Both rivers have a long history of management by the Environment Agency (EA), National Rivers Authority, Northumbrian Water and the Catchment Boards resulting in significant degradation of the rivers and associated water dependent habitats across the catchments. The impact of this historical management is evident through the current Water Framework Directive (WFD) status of the waterbodies across the catchment with 14 waterbodies at moderate WFD status (of which 7 are heavily modified) and 1 at poor WFD status The Pont Ends Project aims to support an improvement in the WFD status of the Blyth from Pont to Tidal Limit waterbody (GB103022077052). This waterbody is designated as a heavily modified waterbody, currently at moderate WFD status. Historical management across the waterbody has included extensive dredging, the installation of extensive flood embankments and disconnection of the river from its floodplain through channel straightening as well as extensive land drainage. This management was primarily delivered to protect agricultural land and aid in the intensification of agriculture.

Key details

Country
United Kingdom
Status
Awarded
Category
Services
Estimated value
£53,004
Procedure
Selective
SME suitable
Yes
Published
28 October 2025
Deadline
Closed
Classification (CPV)
Environmental services

Award outcome

Awarded value
£53,004
Award date
27 October 2025
Contract period
27 October 2025 → 31 March 2026
Winner
  • Fishtek Consulting

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    28 October 2025

Contracting authority

  • Environment Agency

    Buyer

    London, United Kingdom

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Pont Ends River Restoration: Detailed Design — won by Fishtek Consulting — Skim