622469 M20 Thurnham Lane and Water Lane N&S
- Published
- Published 15 October 2025
- Deadline
- Closed 18 May 2025
Overview
The M20 Thurnham Lane North and Water Lane North & South structures are undergoing partial deck
refurbishment, which is scheduled for September 2025.
For all three bridge structures, the Preferred Option to address the stated network need and based on a Whole Life Costing of viable options, is Option 2; to replace the West expansion joint from stringcourse to stringcourse with Part 3 Flexible Plug Joint. This requires a surfacing inlay with HRA the full length of each bridge and 15m beyond each joint in order to accept the replacement joint.
On all three structures, to preserve the existing East Joint, and to maintain the running surface over the joint,
transition strips using flexible plug joint material are to be laid to the back of the joint rails. For each bridge, the
longitudinal joint on the structure is to be raked out and replaced with polysulphide sealant. This approach
ensures a consistent solution across all three bridge structures.
Key details
- Country
- United Kingdom
- Status
- Awarded
- Category
- Works
- Estimated value
- £12,472
- Procedure
- Selective
- SME suitable
- Yes
- Published
- 15 October 2025
- Deadline
- Closed
Surface work for highways
Award outcome
- Awarded value
- £12,472
- Award date
- 2 June 2025
- Contract period
- 18 May 2025 → 18 July 2025
- F M CONWAY LIMITED
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
15 October 2025
Contracting authority
National Highways
BuyerBirmingham, United Kingdom
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.