AwardedUnited KingdomWorks

BHC Compound PV Scheme, Banjul, The Gambia

Published
Published 22 January 2025
Deadline
Closed 17 October 2024

Overview

- The proposed scheme comprises the installation of photovoltaic arrays (PV) together with full replacement of the existing central distribution as part of the works on the British High Commission's Main Compound Site in Banjul, The Gambia. The works include: - Installation of 2 No. new Photovoltaic arrays, ground mounting systems, all associated cabling and underground ducting, AC/DC services, including local energy supplier equipment, submitting applications, local energy supplier liaison and export metering systems. - Replacement of the existing electrical main switchgear assembly to enable incorporation of photovoltaic arrays and battery energy storage facilities. - Provision of battery storage facility situated in the generator building storage room adjacent to the main electrical switch room. - Provision of cooling system including associated power supplies within the new battery storage room to ensure the battery units remain at optimum temperatures. - Provision of mechanical ventilation situated in the generator building storage room adjacent to the main electrical switch room. - Survey ground structure / integrity to confirm that the chosen areas can support the new photovoltaic installation. - Survey the indicative cable ducting route from the proposed inverter positions to the main electrical switch room. Provide new trenching, for ductwork. - Upgrades to the existing switch room and proposed battery storage room that shall include lighting, emergency lighting, fire alarm works and lithium-ion gas detection. - Provision of earthing, bonding and lightning protection system, as required. - Employ a Lightning Protection Specialist to provide a Lightning Protection / Earthing installation to bond any solar steel support frameworks and switchgear as part of these works. - Provision of Builders work holes and fire stopping of service penetrations. - Testing and commissioning of the new electrical switchgear, battery storage and photovoltaic equipment. - Witness testing of the existing generators to ensure change-over functionality is operational. - Testing and commissioning of the new electrical switchgear, battery storage and photovoltaic equipment. - Witness testing of the existing generators to ensure change-over functionality is operational.

Key details

Country
United Kingdom
Status
Awarded
Category
Works
Procedure
Open
SME suitable
Yes
Published
22 January 2025
Deadline
Closed
Classification (CPV)
Electrical installation work of electrical distribution apparatus

Award outcome

Awarded value
£933,250
Award date
14 November 2025
Contract period
13 January 2025 → 9 September 2025
Winner
  • Concept Building Services (Southern) Ltd

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    22 January 2025

Contracting authority

  • Foreign Commonwealth and Development Office

    Buyer

    London, United Kingdom

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: BHC Compound PV Scheme, Banjul, The Gambia — won by Concept Building Services (Southern) Ltd — Skim