Skip to content
AwardedUnited KingdomServices£73,826

EcoSF4: Judas Gap Fish Pass Detailed Design

Published
Published 4 March 2026
Deadline
Closed 16 February 2026

Overview

Judas Gap is an Environment Agency owned structure located at the saline limit on the River Stour on the Essex Suffolk border, NGR TM0799732809. The site already has a pumped eel pass installed in the old fish pass chamber. The Judas Gap structure is critical in terms of fish movements for the Stour, for both freshwater fish that are trapped on the downstream side and migratory fish that require an entry/exit route to the freshwater system, both smelt and sea trout are present in the Stour estuary. The design will also need to ensure that eel passage is maintained. The River Stour has an augmented water supply from the Ely Ouse to Essex Transfer Scheme (EOETS), water is pumped from the Gt Ouse to the top of the rivers Stour and Pant. Located in the Lower Stour is one of the main water supply abstraction points at Cattawade Intake, Essex and Suffolk Water (ESW) abstraction licence number 8/36/15/*S/0123, NGR TM1004933059. Work has been undertaken in the latest round of the Water Industry Natural Environment Programme (WINEP) to ensure flow continues down the Lower Stour and North Channel during low flow conditions, rather than being abstracted from the middle reaches of the Stour, this has been implemented to prevent large scale fish mortalities and wider ecological harm in this section of the river, the EA has worked with ESW to secure 5mld for the operation of a fish passage solution in this section. The requirement to impound water in this section of the river for public water supply abstraction inhibits the possibility for barrier removal. This section of the River Stour is also a navigable waterway.

Key details

Country
United Kingdom
Status
Awarded
Category
Services
Estimated value
£73,826
Procedure
Selective
SME suitable
Yes
Published
4 March 2026
Deadline
Closed
Classification (CPV)
Environmental services

Award outcome

Awarded value
£73,826
Award date
18 February 2026
Contract period
20 February 2026 → 31 July 2026
Winner
  • Jeremy Benn Associates Limited (t/a JBA Consulting)

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    4 March 2026

Contracting authority

  • Environment Agency

    Buyer

    London, United Kingdom

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: EcoSF4: Judas Gap Fish Pass Detailed Design — won by Jeremy Benn Associates Limited (t/a JBA Consulting) — Skim