AwardedUnited KingdomWorks£10,000,000
Fit Out - WP12.5 Architectural Metalwork - Old Oak Common (S4) Station
- Published
- Published 2 August 2023
- Deadline
- Closed 30 August 2023
Overview
WP12.5 Architectural Metalwork
Scope of work:
OOC HS2 Station Architectural Metalwork Package (WP12.5) consists of the design for construction and manufacture, supply, installation and assurance of architectural metalwork to the front of house HS2 Station areas, the Great Western Main Line/ Conventional Station (GWML) and Shared Accommodation Building (SAB). The scope of this package includes the following key elements:
• Steel and glazed balustrades, with integrated lighting.
• Timber handrails, with integrated lighting.
• Platform barriers.
• Lighting columns and armatures.
Key deliverables will be:
• Design Development: Prepare the design for construction and manufacture of architectural metalwork, including detailed plans, elevations, general arrangements, and fabrication drawings. These drawings should encompass all necessary interface and connection details, structural elements and ancillary elements to meet the prescribed performance requirements.
• Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards.
• Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for the installation of architectural metalwork in accordance with the approved design.
• Assurance and Certification: Generate and supply comprehensive assurance documentation for architectural metalwork installations, including testing as required.
• Coordination: Ensure coordination of architectural metalwork installations with various substrates, and other finishes to achieve integration within the overall project.
By executing the works diligently and adhering to the prescribed specifications, our aim is to deliver a high-quality architectural metalwork package that meets the requirements and contributes to the success of the Old Oak Common HS2 Station project.
About the buyer's selection process:
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: HSEQ, Commercial, Programme, Methodology (particularly with working in a track environment).
About the buyer:
In 2018, Balfour Beatty, VINCI and SYSTRA (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.
BBVS are committed to delivering this project to align with the key principles of Integrity, Leadership, Respect & Safety.
Additional information: No Documentation is included at this point.
Key details
- Country
- United Kingdom
- Status
- Awarded
- Category
- Works
- Estimated value
- £10,000,000
- SME suitable
- Yes
- Published
- 2 August 2023
- Deadline
- Closed
Structural steel erection work for structures
Award outcome
- Awarded value
- £0
- Award date
- 30 April 2025
- Contract period
- 26 May 2025 → 31 July 2029
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
1 May 2025
Contract Notice
2 August 2023
Contracting authority
Balfour Beatty VINCI Systra JV
BuyerWatford, United Kingdom
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.