Skip to content
Contract signedUnited Kingdom

Sellafield Skip Size Reduction Facility Enclosure

Published
Published 10 December 2025

Overview

The enclosure will be utilised for removing Intermediate Level Waste (ILW) Pond Skips from PAC-TEK Bags and adding loose contamination Fixodent. The current Poly Vinyl Chloride (PVC) enclosure has an entry doorway from the Bulky Items Area and an exit doorway to the building door between the Bulky Items Area and Waste Sort Area, both features that need to be provided on the new enclosure. There is a roof opening/hatch to allow 3t Maintenance Crane access and a clear panel window for crane operator viewing which also need to be provided. On the current PVC enclosure, there is ventilation extract with HEPA Filtration but due to the current design of the enclosure, this system fails the Ventilation Technical Specialist Group (VTSG) testing. The new enclosure is required to pass the VTSG testing. VTSG’s test criteria for a C3 containment is an air tightness test with a minimum velocity of 0.5m/s measured at all points across the open

Key details

Country
United Kingdom
Status
Contract signed
Procedure
Direct
Published
10 December 2025

Award outcome

Awarded value
£116,700
Award date
8 December 2025
Winner
  • Nuvia Limited

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    10 December 2025

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Sellafield Skip Size Reduction Facility Enclosure — won by Nuvia Limited — Skim