Contract signedUnited Kingdom
Collister Pill Pumping Station
- Published
- Published 29 August 2025
Overview
The pump currently installed at Collister Pill Pumping Station is a Grundfos Sarlin Axial Flow
Pump (type: SA 508 7A511Z 134). This type of pumps is obsolete. As such, we offer Grundfos
KPL Axial Flow pump as a replacement, which is specifically designed for high flow and low
head.
We based our selection on the below duty point:
• Flow Rate = 907l/s
• Head = 3.4m
The new pump offered here is more efficient and comes with a 45kW motor, as opposed to the
original pump’s motor of 50kW. Reduced operational costs are to be expected
Key details
- Country
- United Kingdom
- Status
- Contract signed
- Procedure
- Direct
- Published
- 29 August 2025
Award outcome
- Awarded value
- £49,108
- Award date
- 22 July 2025
- Grundfos Pumps Ltd
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract
29 August 2025
View notice ↗
Contracting authority
Natural Resources Wales
BuyerCardiff, United Kingdom
GB-PPON: PBBR-3628-MPRN
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.