Contract signedUnited Kingdom

W527 - BT - Derby Riverside Utility Diversions

Published
Published 9 May 2025

Overview

Openreach Utility Diversion - Derwent Street, Derby 1 Civil Engineering Works 1.1 Duct Diversion New ducts of an equivalent capacity to the affected plant (or the nearest alternative) will be installed as a replacement to the affected plant. The duct(s) will be installed at standard depths of cover wherever possible. All new apparatus provided for the purposes of diversionary works will be installed as specified by Openreach's current engineering policies and practices. 1.2 Jointing Chambers and Manhole Construction New jointing chambers/manholes may be provided to connect the diversionary ducts to the existing (retained) network. The size and number of chambers may be dependent upon the number of ducts and their intended use. Openreach jointing chambers and manholes have Department of Transport approval. New apparatus provided for the purpose of diversionary works will be installed as specified in Openreach engineering policies and practices. 2 Cabling Works 2.1 Overhead Wires Where overhead wires, cables and associated suspension apparatus require diversion, replacement apparatus will be provided. The new apparatus will be installed in locations that are unaffected by the scheme and agreed with the Client. New apparatus provided for the purpose of diversionary works will be installed as specified in Openreach engineering policies and practices. 2.2 Underground Cables Where underground ducts and cable ducts are to be diverted, replacement cables will be installed into the new duct. The circuits affected by the construction of 900314 scheme include local distribution and optical fibre cables. 2.3 Recoveries On completion of the cable diversions, all redundant Openreach equipment (except underground ducts) will be recovered where possible. No allowance has been made for the recovery of redundant underground ducts as it has been assumed they will be recovered or demolished under the construction phase of the 900314 scheme and the associated works by the Client main contractor. All jointing chambers and manholes made spare by the diversionary works will be demolished by Openreach and will be charged for. 3. Off-Site Works The diversion of some cables and associated circuits (audio and digital trunk, coaxial, short haul data and fibre) will necessitate off-site works. These may include jointing and cabling works at locations other than those associated with the physical diversion and/or testing and balancing works at a telephone exchange or customer premises and will be charged for.

Key details

Country
United Kingdom
Status
Contract signed
Procedure
Direct
Published
9 May 2025

Award outcome

Awarded value
£446,247
Award date
13 March 2025
Winner
  • BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract

    9 May 2025

    View notice ↗

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: W527 - BT - Derby Riverside Utility Diversions — won by BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY — Skim