AwardedMWIWorks€28,600,000
LOT 1 : Construction of water production and Liwonde water supply system
- Published
- Published 6 August 2025
- Deadline
- Closed 26 September 2025
Overview
The Southern Region Water Board has received a loan through the Government of Malawi from the European Investment Bank towards the funding of the Water Supply Improvement for Liwonde and Balaka Towns programme and intends to apply part of the proceeds for the Procurement of:
Water Production System
- Intake: Renovation of the existing river intake at the Shire River, construction of additional pump sump next with pump housing building, installation of 3 pumps
- Transmission main: 580m of DN700 DI from the new intake to the WTP
- Water treatment plant: New 32,500 m3/d (the ultimate capacity of 43,334 m3/d at 2050) consisting of inlet works, flocculation and sedimentation tanks, rapid gravity filters, 3,500 m3 contact tank and one 300 m3 Elevated Steel Backwash Tank. Auxiliary facilities: chemical and chlorination buildings, chemicals storage building, 3 sludge drying beds, one backwash lagoon, administration and laboratory buildings together with site works.
- Pump house: Three (3) Treated water pumping station ranging from 56 m3/h to 300 m3/h and a backwash filter pumping station.
- E & M, instrumentation and control works.
Liwonde Town Water Supply System
- Treated water pumping station: 1 unit 60 m3/h at 86 m
- Water storage reservoir: 3 units – 2 x 5 ML ; 1 x 0,5 ML and 1 x 1 ML
- Transmission main: 20,07 km DI and PVC-U DN 200 to 500 mm
- Distribution system : 41,5 km 10 water kiosks
- E & M, instrumentation and control works
Key details
- Country
- MWI
- Status
- Awarded
- Category
- Works
- Estimated value
- €28,600,000
- Procedure
- Open
- Published
- 6 August 2025
- Deadline
- Closed
Works for complete or part construction and civil engineering work
Award outcome
- Awarded value
- €21,434,561
- Award date
- 8 December 2025
- Contract period
- — → 1 June 2027
- Mohammed Abdulmohsin Al-Kharaf & Sons for General Trading, General Contracting and Industrial Structures W.L.L
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
13 January 2026
Contract Notice
6 August 2025
Contracting authority
Southern Region Water Board
Procuring entityZomba, MWI
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.