Skip to content
AwardedMWIWorks€28,600,000

LOT 1 : Construction of water production and Liwonde water supply system

Published
Published 6 August 2025
Deadline
Closed 26 September 2025

Overview

The Southern Region Water Board has received a loan through the Government of Malawi from the European Investment Bank towards the funding of the Water Supply Improvement for Liwonde and Balaka Towns programme and intends to apply part of the proceeds for the Procurement of: Water Production System - Intake: Renovation of the existing river intake at the Shire River, construction of additional pump sump next with pump housing building, installation of 3 pumps - Transmission main: 580m of DN700 DI from the new intake to the WTP - Water treatment plant: New 32,500 m3/d (the ultimate capacity of 43,334 m3/d at 2050) consisting of inlet works, flocculation and sedimentation tanks, rapid gravity filters, 3,500 m3 contact tank and one 300 m3 Elevated Steel Backwash Tank. Auxiliary facilities: chemical and chlorination buildings, chemicals storage building, 3 sludge drying beds, one backwash lagoon, administration and laboratory buildings together with site works. - Pump house: Three (3) Treated water pumping station ranging from 56 m3/h to 300 m3/h and a backwash filter pumping station. - E & M, instrumentation and control works. Liwonde Town Water Supply System - Treated water pumping station: 1 unit 60 m3/h at 86 m - Water storage reservoir: 3 units – 2 x 5 ML ; 1 x 0,5 ML and 1 x 1 ML - Transmission main: 20,07 km DI and PVC-U DN 200 to 500 mm - Distribution system : 41,5 km 10 water kiosks - E & M, instrumentation and control works

Key details

Country
MWI
Status
Awarded
Category
Works
Estimated value
€28,600,000
Procedure
Open
Published
6 August 2025
Deadline
Closed
Classification (CPV)
Works for complete or part construction and civil engineering work

Award outcome

Awarded value
€21,434,561
Award date
8 December 2025
Contract period
— → 1 June 2027
Winner
  • Mohammed Abdulmohsin Al-Kharaf & Sons for General Trading, General Contracting and Industrial Structures W.L.L

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    13 January 2026

  2. Contract Notice

    6 August 2025

Contracting authority

  • Southern Region Water Board

    Procuring entity

    Zomba, MWI

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: LOT 1 : Construction of water production and Liwonde water supply system — won by Mohammed Abdulmohsin Al-Kharaf & Sons for General Trading, General Contracting and Industrial Structures W.L.L — Skim