Electrical installations required for connection of Battery Energy Storage System (BESS)

Published
Published 24 February 2026

Overview

As part of the AVV Square 2.0 Project a Battery Energy Storage System (BESS) shall be installed within the perimeters of the power station Avedøreværket (AVV), located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark. The BESS shall be integrated in the existing 11.5 kV system of the power station Avedøreværket with connection to the Point of Connection in Installation of BESS (PCI). The electrical installations between the BESS and the PCI shall consist of the following components and systems: a) BESS internal cabling between the BESS equipment units b) Cabling between the BESS and the PCI c) Cabling for communication between the BESS and the existing DCS (Distributed Control System) of AVV d) Cabling between BESS MV Switchgear and DCS & auxiliary power supply e) Cabling between Main MV Switchgear and transformer differential protection relay f) MV cable terminations g) Bonding system of MV cables incl. required equipment such as Earth Continuity Conductor (ECC – if required), Sheath Voltage Limiters (SVL – if required), link boxes (if required) h) Connection of cables to BESS MV switchgear i) Connection of cables to feeder for BESS connection at Main MV switchgear j) MV protection setting study and testing of MV protection system after installation k) Auxiliary Power Supply connection for BESS MV switchgear l) Earthing and bonding of systems and components m) Lightning Protection System n) Cable installation on cable bridges, ladders and trays including required installation material (cable bridges, ladders and trays, cable cleats) o) Cable installation (buried) in trenches and ducts p) The scope of supply includes provision of all cables including but not limited to approximately 4500 meters of 11.5 kV power cables - 1x800 mm² Al XLPE q) The scope of supply also includes: Installation and commissioning of the electrical installations as defined above at the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark.

Key details

Country
DNK
Status
Awarded
Category
Works
Procedure
Limited
Published
24 February 2026
Classification (CPV)
Electrical installation work

Award outcome

Awarded value
DKK 9,833,637
Award date
3 February 2026
Contract period
17 February 2026 → 15 September 2026
Winner
  • Kemp & Lauritzen A/S

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    24 February 2026

Contracting authority

  • Ørsted Bioenergy & Thermal Power A/S

    Procuring entity

    Fredericia, DNK

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Electrical installations required for connection of Battery Energy Storage System (BESS) — won by Kemp & Lauritzen A/S — Skim