AwardedSRBWorks
Reconstruction and modernization of existing railway line and construction of the second track railway Belgrade - Nis, section Stalac -Dunis. Lot 2
- Published
- Published 19 December 2025
Overview
Scope of the procurement includes design-build activities for reconstruction and modernization of existing railway line and construction of the second track railway Belgrade - Nis, section Stalac -Dunis. The total length of the of the line is 17.77km of a double-track railway and will be consisted (but not limited to) of the following main activities:
- Preparation of design documentation in accordance with the Serbian regulations
- Reconstruction of the exiting railway track and construction of the second railway track for a maximum designed speed of 160km/h.
- Construction of the tunnels 1, 2, 3 and 5 using the NATM design and construction method.
- Construction of the Emergency Exit shafts for tunnel number 1 with two exist points on each side of the railway,
- The scope of works includes all the necessary tunnelling and civil works, electrification, and temporary signalling and telecommunication.
Key details
- Country
- SRB
- Status
- Awarded
- Category
- Works
- Procedure
- Selective
- Published
- 19 December 2025
Railway construction works
Award outcome
- Awarded value
- €348,905,039
- Award date
- 27 November 2025
- Contract period
- — → 29 June 2031
- GULERMAK AGIR SANAYI İNSAAT VE TAAHHUT A.S. & YSE Yapı Sanayi ve Ticaret A.S.
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
19 December 2025
Contracting authority
“Serbian Railways Infrastructure” JSC
Procuring entityBelgrade, SRB
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.