Intake, Raw Water Pumping Station and Raw Water Pipeline

Published
Published 5 August 2025

Overview

Construction of Intake, Raw Water Pumping Station and Raw Water Pipeline including Tunnel Crossing of River. Abstraction of 950,000 m3/d of raw water from the Meghna River at Haria and conveying it to the Saidabad WTP site to supply a new Phase III WTP as well as providing a new raw water supply to the existing treatment plants built under Phase-I (225,000 m3/d) and Phase-II (225,000 m3/d). The raw water transmission system will consist of a new pumping station and high voltage electric supply at the intake site, and a 25 km long, 2,200 mm diameter, pipeline system comprising multiple river and road crossings and tunnelling under the Sitalakhya River. The works also include interfacing with the existing raw water supply to the Phase I and Phase II WTPs at Mridhabari.

Key details

Country
Bulgaria
Status
Awarded
Category
Works
Procedure
Selective
Published
5 August 2025
Classification (CPV)
Construction work for water projects

Award outcome

Awarded value
€362,796,783
Award date
28 July 2025
Winner
  • China Machinery Engineering Corporation

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    5 August 2025

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Intake, Raw Water Pumping Station and Raw Water Pipeline — won by China Machinery Engineering Corporation — Skim