AwardedDNKGoods
AVV Square 2.0 - Battery Energy Storage System (BESS)
- Published
- Published 21 October 2025
Overview
The Battery Energy Storage System (BESS) is to be installed within the perimeters of the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark. The BESS will be sized for aminimum of 20 MW usable capacity capable of operating for approx. 2 hours at nameplate rating. The purpose of the BESS is to provide the ancillary services FCR-N (“Frequency Containment Reserve for Normal operations”), FCR-D (“Frequency Containment Reserve for Disturbances”) and FFR (“Fast Frequency Response”), aFRR and mFRR (“automatic/manual Frequency Restoration Reserve”) for participation in the regulation of the electrical transmissionsystem DK2 that is within responsibility of the Transmission System Operator (TSO) Energinet Elsystemansvar A/S. The Contract comprises the following: (a) Delivery of the BESS consisting of Battery bank, Inverter system, BESS transformer, Medium voltage (MV) interface to the interconnection cables, DC and AC switch-boards, HVA/C and fire controlsystem, LV and MV cabling (internally within the BESS, but not between BESS equipment units), housing forcomponents, Energy Management System (EMS), Metering system, and Frequency measurement device, (b) Installation and commissioning of the BESS at the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark, (c) Service and Maintenance Agreement including consumables and spare parts for 2 years operation, (d) First extension of the Service and Maintenance Agreement for additional 4 years including consumablesand spare parts (years 3 to 6 – optional for the Contracting Entity) (e) Second extension of the Service and Maintenance Agreement for additional 4 years including consumables and spare parts (years 7 to 10 – optional for the Contracting Entity) (f) A water-based sprinkler system (optional for the Contracting Entity) (g) Drainage inside the housing forcomponents to handle contaminated fire water (optional for the Contracting Entity).
Key details
- Country
- DNK
- Status
- Awarded
- Category
- Goods
- Procedure
- Limited
- Published
- 21 October 2025
Accumulators, primary cells and primary batteriesRepair and maintenance services of electrical machinery, apparatus and associated equipment
Award outcome
- Awarded value
- €11,350,000
- Award date
- 8 September 2025
- Contract period
- 5 August 2025 → 4 August 2036
- PowerCon A/S
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
21 October 2025
Contracting authority
Ørsted Bioenergy & Thermal Power A/S
Procuring entityFredericia, DNK
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.