Skip to content
AwardedDNKServicesDKK 200,000,000

3XR Consultant - M1&M2

Published
Published 8 November 2024

Overview

The 3xR Project (Re-signaling and Rolling Stock Replacement), by Metroselskabet, is an essential upgrade of the M1 and M2 lines with a new signaling system and additional rolling stock. This major brownfield reinvestment should be designed to address the demands of Copenhagen’s growing population and to continue providing excellent service. The current systems will no longer be supported after 2035, and the seamless switch to a new, driverless signaling system, along with the addition of 42 new trains is required to be implemented within the next Operations & Maintenance contract period. The transition from the existing systems to advanced, cutting-edge technology must minimize disruptions to service and the successful execution and anticipated outcomes of the 3xR Project are critical for maintaining the high quality and reliability of the M1M2 metro system. To achieve these objectives, the consultancy services sought must bring specific expertise across five key areas: 1. Project Management: Capability to maintain alignment with strategic and operational priorities ensuring project milestones are met and stakeholders are fully engaged. 2. Railway Signalling and Control Systems: Expertise in design and implementation of brownfield projects upgrading to Communication-Based Train Control (CBTC) systems, with a focus on risk management and seamless integration within a live operational environment. 3. Rolling Stock: Proficiency in the entire lifecycle management of rolling stock from the design phase through to testing and operational integration, ensuring new trains meet all specifications for safety and comfort. 4. Systems Engineering and Integration: Design and implementation experience in overseeing and integrating complex technical specifications across subsystems and interfacing systems, vital to bolstering overall system functionality and reliability. 5. Financial analysis and commercial strategy: Competencies include conducting initial scenario analysis and cross disciplinary options evaluation based on financial modeling from a lifecycle perspective, identifying opportunities and risks, facilitating strategic decision-making, and providing insights to support sustainable business growth and transformation. Project 3XR requires a consultancy that can navigate the complexities of introducing substantial technological upgrades within the metro’s operational framework. The selected consultancy will need to manage and execute scenario analysis, prepare tenders, develop technical requirements and ensure comprehensive integration of systems from initiation to final handover to operation.

Key details

Country
DNK
Status
Awarded
Category
Services
Estimated value
DKK 200,000,000
Procedure
Limited
SME suitable
Yes
Published
8 November 2024
Classification (CPV)
Engineering servicesConsultative engineering and construction servicesTransport systems consultancy servicesTechnical testing, analysis and consultancy services

Award outcome

Awarded value
DKK 120,808,235
Award date
9 May 2025
Contract period
— → 7 March 2037
Winner
  • Cowi, WSP JV

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    30 May 2025

  2. Contract Notice

    8 November 2024

Contracting authority

  • Metroselskabet I/S

    Procuring entity

    København S, DNK

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: 3XR Consultant - M1&M2 — won by Cowi, WSP JV — Skim