Skip to content
AwardedFranceWorks

Travaux interconnexion AEP entre Chessenay et Provenat - Route de Thônes, Dingy-Saint-Clair-484

Published
Published 13 April 2026
Deadline
Closed 21 May 2026

Overview

O DES ARAVIS awarded works to LATHUILLE BTP on 6 July 2026 for €139,988.50 to interconnect water supply (AEP) between Chessenay and Provenat along Route de Thônes in Dingy-Saint-Clair. The scope includes installing approximately 470 metres of PEHD DN125 pipe under a departmental road at an average depth of 1.10m, replacing two hydrants, creating a new drainage chamber with sectioning valve, removing equipment from the existing chamber, resurfacing the road, conducting pressure and bacteriological tests, and producing topographic surveys and updated plans. The work was completed as a single lot with no water supply maintenance constraints as the existing pipe is abandoned.

Key details

Country
France
Status
Awarded
Category
Works
Procedure
Open
Published
13 April 2026
Deadline
Closed
Classification (CPV)
Earthmoving workWorks related to water-distribution pipelines

Award outcome

Awarded value
€139,989
Award date
6 July 2026
Contract period
1 June 2026 → 5 June 2026
Winner
  • LATHUILLE BTP

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    8 July 2026

  2. Contract Notice

    13 April 2026

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Travaux interconnexion AEP entre Chessenay et Provenat - Route de Thônes, Dingy-Saint-Clair-484 — won by LATHUILLE BTP — Skim