Skip to content
AwardedFranceServices

Marché de maîtrise d'oeuvre pour la déconstruction et reconstruction du groupe scolaire et d'un accueil de loisirs « La porte des Îles » à la Barre de Monts (85)

Published
Published 30 January 2026

Overview

The Commune de la Barre-de-Monts awarded a design services contract for the deconstruction and reconstruction of the school group and leisure facility "La porte des Îles" in la Barre-de-Monts (85) following a sketch-based competition. The project, with an estimated construction cost of €2.22 million, was awarded to a multidisciplinary team led by Collectif FARO Architectes and including specialists in architecture, engineering, acoustics, landscape design, and project management.

Key details

Country
France
Status
Awarded
Category
Services
Procedure
Selective
Published
30 January 2026
Classification (CPV)
Architectural, construction, engineering and inspection services

Award outcome

Award date
23 January 2026
Winners
  • A2I INFRA (VRD)
  • ACOUSTIBEL (Acoustique)
  • BEGC (Cuisine)
  • Cabinet Denis ROUSSEAU (Economie de la construction)
  • Collectif FARO Architectes (Mandataire, Architecture)
  • INDDIGO (Fluides/SSI)
  • INGELIGNO (Structure bois)
  • INTECO (OPC)
  • LE VOTRE Paysage (Paysagisme)
  • SISBA (Structure béton)

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    30 January 2026

Contracting authority

  • Commune de la Barre-de-Monts

    Procuring entity

    La Barre de Monts, France

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Marché de maîtrise d'oeuvre pour la déconstruction et reconstruction du groupe scolaire et d'un accueil de loisirs « La porte des Îles » à la Barre de Monts (85) — won by A2I INFRA (VRD) +9 — Skim