AwardedGermanyWorks€1
Charlottenburg Combined Heat and Power Plant (CCHP) - Lot 1
- Published
- Published 15 December 2025
Overview
This lot 1 includes the turnkey engineering, procurement, construction and commissioning of
- 3 gas turbine generator trains & heat recovery boilers, incl. auxilliary systems. Utilization of supplementary firing as necessary
- gas compressor station
- 110kV grid connection and power supply system
- buildings for each of the above mentioned systems (being three main buildings. For the main turbine hall building a "0-meter" level with a sufficiently designed foundation will be provided by the awarding authority).
-Long Term Service Agreement (LTSA) for the Gas Turbine Units
The purpose of the overall undertaking at Charlottenburg Site (located Am Spreebord 5, 10589 Berlin), is to ensure heat supply security in the connected district heating grid by replacement of existing gas fired
turbines with reliable alternatives and enable coal phase-out until 2030 by installing additional heat capacity.
Furthermore, the undertaking supports regulatory and strategic needs by focusing on low carbon heat generation. By flexible adaption of heat generation to changes of electricity and gas prices, in accordance
with overall system demands, the undertaking supports profitable heating business considering future market uncertainty and volatility.
To fulfill Vattenfall's fossil free strategy, the undertaking utilizes gas as a transition technology to hydrogen and enables sector coupling.
The total required thermal feed-in capacity is approx. 550 MW, split up into a gas fired portion and a power-to-heat portion. Certain relevant limitations for execution of the undertaking, arising from the need for
existing assets to remain in operation until new assets are commissioned to ensure supply security, the urban environment, monument preservation requirements for specific buildings, and the available capacity
of the gas supply line (approx. 620 MW LHV) - have to be considered.
In the course of this undertaking, several projects are being developed by the awarding authority, including building of new generation and infrastructure assets as well as demolition and refurbishments of existing
assets; one of such projects is the Charlottenburg Combined Heat and Power project (“CCHP”).
This notice concerns and announces the tender for the lot 1 named CCHP project within the undertaking of Charlottenburg Site, which is composed mainly of a gas turbine-based CHP Plant.
Other lots and projects will be announced by the awarding authority at a later point in time. However predecessing activities were partly already contracted such as the demolition of the existing buildings as
well as preliminary design activities.
Key details
- Country
- Germany
- Status
- Awarded
- Category
- Works
- Estimated value
- €1
- Procedure
- Limited
- SME suitable
- No
- Published
- 15 December 2025
District heatingHydrogenGeneratorsTransformersGas turbinesGas compressorsConstruction work for power plant
Award outcome
- Awarded value
- €1
- Award date
- 12 August 2025
- Contract period
- 15 August 2025 → 30 September 2030
- Sener Ingeniería y sistemas
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
15 December 2025
Contract Notice
19 January 2024
Contract Notice
11 December 2023
Contracting authority
BEW Berliner Energie und Wärme GmbH
Procuring entityBerlin, Germany
Authority website ↗
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.