AwardedIRLWorksFramework agreement€50,000,000

TII422_Renewals (Track and Associated Works) for the Luas Light Rail System: Single Party Framework

Published
Published 31 July 2024
Deadline
Closed 18 September 2024

Overview

TII intends to enter into a Single Party Framework Agreement for renewals (track and associated works) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities: 1. Developing a detailed construction design associated with the objective of replacing trackwork and/or associated equipment and installations on Luas, 2. Developing the specific programme of works, 3. Developing the specific methodology – location based, 4. Developing the Traffic Management design – to be approved by the relevant Local Authority, TII and the Luas Operator, 5. Interface with Luas Operator and Maintainer as required, 6. Carrying out all the necessary works as specified for trackwork and/or associated equipment and installations on Luas. Those works will include all preparatory works and all closing out works to make good the affected assets, 7. Produce the Safety File, 8. Supply of materials including rail and railway components and tooling eg. Specialist track, track interfacing equipment, sealants/grouts and materials used for works on or near the Luas system, and 9. Any other associated works required by the Client; including work on track related equipment such as points machines, installation, purchase, interventions of similar equipment, work on on-track-plant, supply of and interventions on track related tooling, interventions on track systems such as tamping, grinding, milling, and all works on or near Luas track asset group, 10. Provide a handover file and as-built drawings in accordance with TII requirements.

Key details

Country
IRL
Status
Awarded
Category
Works
Estimated value
€50,000,000
Procedure
Selective
Contract type
Framework agreement
SME suitable
Yes
Published
31 July 2024
Deadline
Closed
Classification (CPV)
Railway and tramway locomotives and rolling stock and associated partsRailway-track construction materials and suppliesRailway-track construction materialsRailway materialsRailway-track construction suppliesRailway construction worksConstruction work for railways workshop

Award outcome

Award date
15 April 2025
Winner
  • GPX Rail Ltd

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    19 May 2025

  2. Contract Notice

    6 September 2024

  3. Contract Notice

    30 August 2024

  4. Contract Notice

    31 July 2024

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: TII422_Renewals (Track and Associated Works) for the Luas Light Rail System: Single Party Framework — won by GPX Rail Ltd — Skim