Skip to content
Open for bidsRomaniaWorksRON 1,182,925,543

PROIECTARE SI EXECUȚIE:Drum TransRegio Feleac TR 35- Et I Centura Metropol TR 35 și Drumuri de Leg “ Faza I – Centura Metropol TR 35 şi Drumuri de leg, LOT 2- TR35 de la km 14+747(Nod 5 Floresti)la intrare Tunel 1 km19+600 (Incl. Nodul 5[Floresti], nodul 6[Cora], nodul 7[Colina] si drum B4, de la Nod 7[Colina] la Spital Regional si drum B4.3-de la drum de legatura B4.2 la drum de keg B4.1)

Published
Published 17 April 2026
Deadline
Deadline: 5 August 2026 (12 days left)

Overview

Cluj-Napoca Municipality is inviting tenders for the design and construction of Lot 2 of the TransRegio Feleac TR 35 Metropolitan Ring Road project, covering the road section from km 14+747 (Node 5 Floresti) to the entrance of Tunnel 1 at km 19+600, including three junction nodes and connecting roads to the Regional Hospital. The estimated value is approximately 1.18 billion RON, with submissions due by 5 August 2026.

Key details

Country
Romania
Status
Open for bids
Category
Works
Estimated value
RON 1,182,925,543
Procedure
Open
Published
17 April 2026
Deadline
5 August 2026
Classification (CPV)
Road bridge construction workRoad construction worksEngineering-design services for traffic installations

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Notice

    19 June 2026

  2. Contract Notice

    19 May 2026

  3. Contract Notice

    17 April 2026

Contracting authority

How to win this tender

The playbook Skim runs on every opportunity, from first look to submission.

  1. See the full details on Skim

    Summary, documents, buyer history and key dates for this tender, in one place.

  2. Check fit with AI

    Score the tender against your company profile — a clear bid or no-bid call in minutes, not days.

  3. Access the portal and extract the files

    Skim pulls the notice documents and surfaces every requirement, so nothing gets missed.

  4. Confirm it is right for you

    Requirements, evaluation criteria and deadlines laid out, so you commit with confidence.

  5. Draft the response with Skim

    Each answer drafted from your evidence and past bids — you review, refine and approve.

  6. Submit through the portal

    On time, compliant, and with every requirement covered.

See exactly how Skim’s agents do this →

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

Find tenders like this before your competitors do.

Skim scans every portal daily and scores each tender against your profile. Start a free 7-day trial and see the tenders you are missing.

PROIECTARE SI EXECUȚIE:Drum TransRegio Feleac TR 35- Et I Centura Metropol TR 35 și Drumuri de Leg “ Faza I – Centura Metropol TR 35 şi Drumuri de leg, LOT 2- TR35 de la km 14+747(Nod 5 Floresti)la intrare Tunel 1 km19+600 (Incl. Nodul 5[Floresti], nodul 6[Cora], nodul 7[Colina] si drum B4, de la Nod 7[Colina] la Spital Regional si drum B4.3-de la drum de legatura B4.2 la drum de keg B4.1) — Skim