Skip to content
AwardedIRLServices€180,000

Architect led Design team services for the construction new maintenance workshops in the existing Energy Centre at SJH

Published
Published 9 January 2026

Overview

The purpose of this competition is to procure a Single Point Design Team for project described. Applicants must consider the full range of potential services which may be required through the lifetime of the projects including but not limited to, (a) Full Design Team services (including leading, coordinating and managing statutory application processes) (b) Partial Design Team services (c) Replacement Design Team services (d) Building Services Engineering Design Services (M and E) (e) Civil and Structural Engineering Design Services (f) Quantity Surveying Services (g) Floor Area Analysis (h) Planning Consultation (i) Employer Representative (ER) (j) Assigned certifier services (k) PSDP Services (l) Other services of a similar nature required by the Client such as: Supporting the Contracting Authority through each of the various project life cycle stages and approval gateways as defined within DPER's Infrastructural Guidelines (previously the Public Spending Code). The project consists of the construction of new FM maintenance workshops within the existing energy centre on campus. The current proposal shows the new workshops being split over 3 new floors within an existing fallow space in the energy centre. There will be some works required to the external façade to accommodate new wondows for natural light. There will be a requirement to re-locate the LV transformer associated with the site CHP and 2 no. electrical distrbution boards to facilitate the new area. l The estimated Notional Construction Value (NCV) for the project is €1,500,000 incl VAT

Key details

Country
IRL
Status
Awarded
Category
Services
Estimated value
€180,000
Procedure
Selective
Published
9 January 2026
Classification (CPV)
Architectural and related servicesArchitectural design servicesArchitectural, engineering and planning services

Award outcome

Award date
19 February 2026
Contract period
— → 14 February 2027

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    20 February 2026

  2. Contract Notice

    9 January 2026

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Architect led Design team services for the construction new maintenance workshops in the existing Energy Centre at SJH — Skim