AwardedSWEWorksSEK 90,000,000
Convection parts (boiler tubes) for Unit 1 and 4 in the Uppsala Waste incineration plant
- Published
- Published 11 November 2025
Overview
LTE Investment for Unit 1 and 4 in the Waste incineration Plant AFA in Uppsala, Sweden.
The waste incineration plant in Uppsala consists of a total of three waste boilers, two of which are from the 80s and one that was commissioned in 2005. The waste incinerators are the base production units of district heating and steam in Uppsala.
On the two older waste boilers, Unit 1 and 4, it is time to replace pressure vessel parts (convection parts) in order to continue operations until 2040. Other parts (membrane walls in furnace and the so-called “lattice tubes” have previously been replaced and supplemented with overlay welding.
The steam data is 15 bar(g) and 200°C for both boiler.
This procurement concerns replacement of the convection parts in the horizontal pass (three evaporator bundles and one economizer) of Unit 4, to be carried out during summer overhaul of 2026. As an option we also ask for replacement of the corresponding parts of Unit 1 during the summer of 2027. As another option, the tenderer shall also include replacement of the membrane walls surrounding the horizontal passes. The Purchaser will supply detailed drawings of the existing tube bundles and the Contractor shall design, manufacture and install the new tubes with necessary adaptations to modern criteria for design, testing and inspection.
Also included in the scope is a new soot cleaning system for the convection parts. The tenderer shall include removal and scrapping of the old rapping system and replacement with a more modern system. The basis for the design will be a visit to the site as well as boiler drawings.
Key details
- Country
- SWE
- Status
- Awarded
- Category
- Works
- Estimated value
- SEK 90,000,000
- Procedure
- Limited
- Published
- 11 November 2025
Waste incineratorsPressure vesselsMechanical engineering installation works
Award outcome
- Awarded value
- SEK 52,000,000
- Award date
- 16 February 2026
- BWSC
- Kanadevia Inova Denmark A/S
- MARTIN GmbH
- NEM Balcke-Dürr GmbH
- Sumitomo SHI FW Energi Aktiebolag
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
2 April 2026
Contract Notice
11 November 2025
Contracting authority
Vattenfall AB Procurement Heat Sweden
Procuring entitySolna, SWE
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.