Skip to content
AwardedUKRGoods€9,000,000

Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of € 9,000,000.00 (nine million euros), sales taxes and customs duties excluded

Published
Published 25 July 2024
Deadline
Closed 22 August 2024

Overview

Supply of city articulated trams, mono-directional, one driving cab, equipped with three bogies taking into consideration the permissible axle load. 100% of the length of the passenger compartment must be low with free access without steps to all passenger doors from the stop platform. Number of sections: no more than three. The Tramway shall have the following outer dimensions: length: 26,000 mm to 27,000 mm; width: nominal 2,500 mm; height: maximum 3,500 mm (3,700 mm with current pantograph in down position); minimum curve radius: 20 meters in main line (maximum speed of 10 km/h); minimum standard curve radius: 18 meters in depot; wheel base: 1,800 mm – 1,900 mm; the distance from the axis of the track to the edge of platforms for passengers, located on the straight line of the track is 1,350 mm. Total number of passengers expected: 250 (± 10%) with 8 passengers/m² (load for AW3); number of seats: not less than 60 ± 10%; number of wheelchair spaces: at least 1. Further information can be obtained in the Tender Documents.

Key details

Country
UKR
Status
Awarded
Category
Goods
Estimated value
€9,000,000
Procedure
Open
Published
25 July 2024
Deadline
Closed
Classification (CPV)
Railway and tramway locomotives and rolling stock and associated parts

Award outcome

Awarded value
€8,717,888
Award date
5 February 2025
Contract period
— → 2 March 2026
Winner
  • Limited Liability Company “TATRA-YUG”

Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.

Notice history

Every published notice in this contracting process, newest first.

  1. Contract Award Notice

    12 February 2025

  2. Contract Notice

    25 July 2024

  3. Contract Notice

    4 July 2024

  4. Contract Notice

    17 June 2024

  5. Contract Notice

    5 June 2024

  6. Contract Notice

    27 March 2024

Contracting authority

Get the full picture

AI analysis, bid scoring, and expert strategy for this tender

Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.

See which competitors are winning the contracts you're chasing.

15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.

Awarded: Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of € 9,000,000.00 (nine million euros), sales taxes and customs duties excluded — won by Limited Liability Company “TATRA-YUG” — Skim