AwardedDNKGoods
AVV Square 2.0 - BESS MV Switchgear
- Published
- Published 13 January 2026
Overview
The Contract is for the delivery, installation and Site Acceptance Testing (SAT) of 1 (one) medium-voltage air-insulated switchgear to be installed in the substation for the connection of the Battery Energy Storage System (BESS) to the main MV switchgear in Avedøre Power Plant in Denmark to the Contracting Entity for the Project. General characteristics of the switchgear:
• Rated voltage: 17.5 kV three-phase
• Operating voltage: 11.1 kV
• Frequency: 50 Hz
• Insulation level: 38 kV – 50 Hz, 1 min
• BIL: 95 kV – 1.2/50 μs
• Busbar rated current: 2500 A
• Short-circuit current: 63 kA / 1 s
• Internal arc classification: AFRL - 63 kA / 0.5 s
• Rated current of circuit breakers:
• Incomer cubicle: 2500 A
• Feeder cubicles: 630 A
• Auxiliary services cubicle: 630 A
Key details
- Country
- DNK
- Status
- Awarded
- Category
- Goods
- Procedure
- Limited
- Published
- 13 January 2026
Medium-voltage equipment
Award outcome
- Awarded value
- €558,280
- Award date
- 1 December 2025
- Contract period
- 18 December 2025 → 27 August 2026
- ABB A/S
Contract ending soon? Skim tracks incumbents and flags recompetes early. Book a demo to set up alerts.
Notice history
Every published notice in this contracting process, newest first.
Contract Award Notice
13 January 2026
Contracting authority
Ørsted Bioenergy & Thermal Power A/S
Procuring entityFredericia, DNK
Get the full picture
AI analysis, bid scoring, and expert strategy for this tender
Skim analyses every tender against your company profile and tells you whether to bid, how to win, and who you are up against.
See which competitors are winning the contracts you're chasing.
15-minute call. We'll pull the win data on your real pipeline and show you what Skim does with it.